Blerg.
Amtrak NEC Service, New Haven (NHV) to Washington Union Station (WAS):
Train 175, Northeast Regional, 5'46", $139
Train 2173, Acela Express, 4'36", $213
So for $74 extra you get there roughly an hour and ten minutes faster, provided they both run on-time. (In my experience the Acelas tend to run on-time more often than the regionals, although they both run late more frequently than they should.) The Acela is also a business-class seat while the Regional is coach, and the Acela train is nicer overall.
Whether it's worth the extra money for the extra hour is a personal decision, of course, but I don't think the pricing is wholly inappropriate. It would be great if the Acela was faster because that would make the value equation that much better, but it's not a terrible ripoff as-is.
EDIT: These are fares for today, the equivalent of a "Yankee-class" ticket on an airline. You could do better by buying with a 3-day advance, but I think the Acela/Regional delta would be about the same, percent-wise.
Alternatively, I just checked and you can fly from Boston to Baltimore (today, with no advance purchase) for $96, and it takes 1'24". (I admit this isn't quite your example, but it's a reasonable illustration of a similar route).
Or you could drive New Haven to DC, which is 306 miles, and google maps suggests 5 hours 30 mins (admittedly optimistic in traffic). If you drive alone in a gas-hogging 25 mpg car like mine that'll cost you about $40.
I'm starting to understand why nobody takes the Amtrak.
Dude, it is still crap expensive. In my country you pay $210 for a 2000km plane ticket return (4000km total). That is just crazy.
In China trains are dirt cheap, on-time, clean and fast (at least the ones I took). Why does that train of yours have to be that expensive?
You don't need to be better than highway speed to be extremely valuable. The Acela is a much easier way to get from NYC to Boston than driving (done both), and it's more reliable and sometimes faster than flying.
The Acela Express can go up to 150mph, but it is prohibited from going that speed in a lot of areas, and from what I've read it isn't very reliable.
http://is.gd/39PZO
Of course, the Obama Administration will avoid any project where they can be expected to have made measurable progress in six months. It's much easier for them to just keep talking about what they're working on than it is to actually fix anything.