Re:Microsoft blames monster email outage on software defect ... by CobaltFire on Monday November 16, 2026 @05:10PM (#50524116)
I never worked in civilian power generation, but I can vouch for this on Nuclear Ships.

We had to practice load pickup on a normal start at the pier often, but we likely practiced a full SCRAM to back online (including a FULL load shutdown) more.

Having predefined lists of what gets brought up at various points helps a ton, but it's still not an easy or simple operation.

Re:Microsoft blames monster email outage on software defect ... by TomatoCo on Monday November 16, 2026 @06:29PM (#50525088)
I imagine the predefined list is easier when it's all consumers that are under your control. I figure with civilian power some random percent of houses'll kick their AC on after power is restored.
Re:Microsoft blames monster email outage on software defect ... by noir_lord on Monday November 16, 2026 @09:13PM (#50526536)
It's why they bring up a subset a bit at a time and fewer houses/businesses than would be expected under average load, Practical Engineering has a fantastic video on black starts[1]

[1] https://www.youtube.com/watch?v=uOSnQM1Zu4w

Re:Microsoft blames monster email outage on software defect ... by lifeformed on Monday November 16, 2026 @09:58PM (#50526837)
I never worked on nuclear ships, but I can vouch for this in Satisfactory.

You need a temporary source of power to start the water pumps and it takes a while for the water to flow all the way through the system and for the coal to saturate all the belts and power plants, if you hook it up to the main grid before all the plants are operational then it shuts down again.

Re:Microsoft blames monster email outage on software defect ... by epiccoleman on Monday November 16, 2026 @10:35PM (#50527095)
heh. this is why I've got programmable speakers hooked up to the belt that feeds fuel to the steam generators in my Factorio world - because I had one too many times where I moved something or messed up my logistics and had to cold start the base by hand feeding coal to get back online.

Factorio makes this fairly easy for the most part, a cold start isn't really some massive engineering challenge, but still, worth guarding against. By the time you get solar and / or nuclear power is basically solved, at least on Nauvis, but it's "overengineering the game," so... we overengineer.

Re:Microsoft blames monster email outage on software defect ... by cowlevel on Tuesday November 17, 2026 @04:14AM (#50529187)
FYI you can put your coal mining stuff on a separate power network, and then an overload on the main network won't cascade to it.
Re:Microsoft blames monster email outage on software defect ... by pjc50 on Tuesday November 17, 2026 @04:53AM (#50529426)
Yeah, Gleba seems deliberately set up to make brownouts risky (letting your supply of trapped pentapod eggs hatch and eat your base) and black starts harder - base fills up with spoilage which needs to be removed. At least you can burn the waste for fuel.

In Factorio, solar is an easy source of cold start. In the real world, I think hydropower is a commonly designated choice and the solar farms have to wait for a grid to sync against.

Re:Microsoft blames monster email outage on software defect ... by marcosdumay on Tuesday November 17, 2026 @12:10PM (#50534587)
Power switches are your friend.

Cold starts are a constant in Aquilo until you research and build fusion power. And whatever you do by hand to handle them, there's a device in the game that does it automatically too.

Re:Microsoft blames monster email outage on software defect ... by epiccoleman on Tuesday November 17, 2026 @02:55PM (#50537204)
Neat, I haven't gotten to Aquilo yet, but I understand it's quite a challenge. Currently working through vulcanus in my first space age save.
Re:Microsoft blames monster email outage on software defect ... by Beretta_Vexee on Tuesday November 17, 2026 @04:50AM (#50529400)
It’s much the same principle as with an electricity grid, but on a different scale. We start up diesel generators to start gas turbines, which in turn supply power back to the distribution substations.

Once we’ve restored power to the substations, we can carry out what are known as voltage restoration operations.

At a nuclear power station, if all goes well, there will be at least one nuclear reactor unit that has managed to operate in island mode. They have their own sub station and can restart the others units.

We restart as many units as possible on a virtually empty section of the grid (serving only essential and vital consumers such as hospitals). We then reconnect consumers in a predefined order to avoid significant fluctuations that could trigger further cascading failures.

The most difficult part is often identifying the exact cause of the blackout with certainty, so as to prevent it from repeating it.