Re:Microsoft blames monster email outage on software defect ...
by cowlevel on Tuesday November 17, 2026 @04:14AM
(#50529187)
FYI you can put your coal mining stuff on a separate power network, and then an overload on the main network won't cascade to it.
Re:Microsoft blames monster email outage on software defect ...
by pjc50 on Tuesday November 17, 2026 @04:53AM
(#50529426)
Yeah, Gleba seems deliberately set up to make brownouts risky (letting your supply of trapped pentapod eggs hatch and eat your base) and black starts harder - base fills up with spoilage which needs to be removed. At least you can burn the waste for fuel.
In Factorio, solar is an easy source of cold start. In the real world, I think hydropower is a commonly designated choice and the solar farms have to wait for a grid to sync against.
Re:Microsoft blames monster email outage on software defect ...
by marcosdumay on Tuesday November 17, 2026 @12:10PM
(#50534587)
Power switches are your friend.
Cold starts are a constant in Aquilo until you research and build fusion power. And whatever you do by hand to handle them, there's a device in the game that does it automatically too.
Re:Microsoft blames monster email outage on software defect ...
by epiccoleman on Tuesday November 17, 2026 @02:55PM
(#50537204)
Neat, I haven't gotten to Aquilo yet, but I understand it's quite a challenge. Currently working through vulcanus in my first space age save.
Factorio makes this fairly easy for the most part, a cold start isn't really some massive engineering challenge, but still, worth guarding against. By the time you get solar and / or nuclear power is basically solved, at least on Nauvis, but it's "overengineering the game," so... we overengineer.