The initial start up (of the cold start plants) took the double of time expected. The "cold start" capacity is being increased due to some of the issues found.
Portugal was able to recover in 12h (still a lot) without any external assistance.
> By 07:00 CEST (05:00 UTC) on 29 April, electricity had been restored to 99% of energy demand, and full restoration was achieved by 11:00 CEST (09:00 UTC) that same day.
The wikipedia references seem valid for this precise timeline, which is more informative than your remark.
https://en.wikipedia.org/wiki/2025_Iberian_Peninsula_blackou...
I'm not trying to win a pissing match, just trying to counter the very common miserabilist notion that Portugal did worse than Spain.
This specific problem was (1) caused in Spain, (2) fixed faster in Portugal, and (3) without external help.
Portugal could've been the cause, and could've done better, for sure.
But it's just not balanced to write "In Portugal it didn't go that well" as a response to "It went remarkably well [in Spain]." Makes it sound much worse than it actually was.
Do you have any engineering insight on why a hydropower plant was used, and not, say, a gas-fired power plant?
Once the hydro station is back online the power it generates can be used to provide house load to the other stations.
It went remarkably well.