Re:Entso-E final report on Iberian 2025 blackout by wortelefant on Friday March 20, 2026 @01:36PM (#47457913)
It is very carefully worded, but variable renewables are holding the smoking gun here. This is why spain now requests a better connection to french nuclear now. This reckless overbuild of variable generation is a valuable negative example, wind and solar without adequate hydro or nuclear is dead
Re:Entso-E final report on Iberian 2025 blackout by TheOtherHobbes on Friday March 20, 2026 @02:09PM (#47458381)
It's lack of experience managing variability, not variability itself.

Wind and solar are very far from dead, but they do need some adjustments - as the report makes clear.

Re:Entso-E final report on Iberian 2025 blackout by anthk on Saturday March 21, 2026 @03:20PM (#47470337)
Spaniard here, I didn't hear about that.
Re:Entso-E final report on Iberian 2025 blackout by Rygian on Saturday March 21, 2026 @04:04PM (#47470736)
Your statement is wrong.

The report describes that there was no mechanism to dispatch the reactive power of renewables separately from the active power.

In page 452, item numbered 1 states "RES power plants follow fixed power factor" (RES = Renewable Energy Sources). The source of this finding is in section 4.2.1.

In page 208, footnote 35, the reference is given to Royal Decree 413/2014 of 6 June, which mandates this fixed power factor. The Article 7, section e), states that renewable energy sources must follow the instructions given by the operator to set power factor, and only if the distribution lines support it.

And footnote 36 describes how this worked in practice on the date of the outage: renewables were told, by email on the previous day, which fixed power factor correction to use the following day.

--

This lack of dynamic dispatch of reactive power was a known problem, already reported in 2022 [1]

[1] https://www.eldiario.es/economia/competencia-reconocio-julio...