The only thing to manually migrate are data migrations from one schema to the other.
At least you can opt-in to automated migrations in Elixir if you use Ash.
There's a pre, do and post phase for the migrations. When you run a single migration, it's: pre, do, post. When you run 2 migrations, it's: pre [1,2], do: [1,2], post: [1,2].
So, if you have a migration that depends on a previous migration's post phase, then it will fail if it is run in a batch with the previous migration.
When I've run into this is with data migrations, or if you're adding/assigining permissions to groups.
The only catch is they will run multiple times, once for each app, but that can also be prevented by passing a sender (e.g. `pre_migrate.connect(pre_migrate_signal_handler, sender=self)` if you are registering them in your AppConfig.ready method).
Its always a surprise when i went to Elixir or Rust and the migration story was more complicated and manual compared to just changing a model, generating a migration and committing.
In the pre-LLM world, I was writing ecto files, and it was super repetitive to define make large database strucutres compared to Django.