I understood that temperature wasn't the problem. How it works is that you pump water into one well, and get it out from an adjacent one. The main problem was permeability, they couldn't get the necessary flow rate between the wells.
Re:250MWh 'Sand Battery' to start construction in Finland by baq on Friday November 28, 2025 @04:12AM (#46076990)
Ah good to know, I for some reason thought it wasn't hot enough. Sounds like they need to figure out horizontal drilling 8km deep in volcanic rock.