Re:250MWh 'Sand Battery' to start construction in Finland
by distances on Friday November 28, 2025 @03:37AM
(#46076774)
I understood that temperature wasn't the problem. How it works is that you pump water into one well, and get it out from an adjacent one. The main problem was permeability, they couldn't get the necessary flow rate between the wells.
[ Parent
| on HN ]