I feel that as engineers we generally react negatively to the idea of bike-shedding or "building cathedrals" but the reality is that there is always a bike-shed. The question we should be asking is not should we deliberate over the design of the project, but rather to what degree does this project (and consequently the business in paid situations) benefit from deliberation.
In the case of personal projects, I am far more concerned with the process then the outcome and will allow myself to indulge in bike-shedding maximally.
Otherwise I find so much time is wasted on tiny details that don't matter, and the overall picture still fails to emerge (aka a definitional bike-shedding session).
- Make a list of the 10 tiniest tasks with the least amount of estimated effort you can find or think of that need to be done
- Maybe save task 10 for a super quick prioritizing of the other 9 tasks, or don't because they are tiny tasks, after all
- Complete the 10 tiniest tasks
- Repeat the process until there are no more tasks (of course, there are always more tasks)Everyone else presuming you need a list to keep track of them is missing the point - spontaneous and immediate action with minimal commitment.
It really is liberating.
This is a big part of the GTD framework that is almost always dropped in the retelling but which I think is fundamental. The tasks should be broken down to the next physical thing you can do so you don't have to think to act.
Also you have cool interests
If you don't usually forget tasks/events or freeze up because of analysis paralysis, you can get by just fine without it.
GTD definitely brings an overhead that doesn't pay off in a reasonably simple life
GTD is not religion (or at least it should not be - with some people it is), you won't go to hell or something if you don't do everything perfect.
1. Break down the steps. Can you find a recipe of steps for achieving the thing? Then start with the first step. Maybe that's a small enough task. Maybe you don't have to perform all steps in order, and you can find a small-enough step to do next.
2. Isolate the fundamental challenges. There is often a tough nut to crack within the problem. Can you isolate that from the rest of the project, and turn it into its own thing (I like to cast this as a "toy" problem)? When I say "isolate," I mean to remove all unnecessary complexity to getting at the fundamental issue. Suppose I want to figure out how to create a robust messaging network. There might be user interfaces and caching and different kinds of messages and different networks and different failure mechanisms and performance issues and ... So just create a "toy" at each step: First, simply send & receive a message. Don't worry about performance or worry much about robustness. You now have a small task but whose completion achieves a fundamentally necessary part of the larger task. Finishing that will feel good--you have something that works!--and you've made real progress. You might find examples of others doing something similar to this basic task as well, so you can work on your own but then compare notes to others to gain insights on why others have solved similar problems differently than how you solved it (you might have come to something better, or not; either way, you now have understanding of the fundamental problems involved). Now you can grow that toy or take what you learned from the toy and apply it to the larger task.
3. Similar to 2, but maybe a different POV: The physics joke is approximating a cow as a perfect sphere to study its dynamics. Simply the hell out of a problem! Maybe it feels ridiculously simple. Fine; now you are working with something completely tractable. You can then add in complexity to your model one wrinkle at a time.
4. Do something that's actually easy even if i might not be "significant" from the "big challenges to getting this project working" POV. Maybe you've been frustrated for a week or two trying to solve the tough-nut-to-crack bit of the problem. Even your toy problem remains (what feels hopelessly) broken! Switch over to creating the GUI or something superficial but that is easily tractable yet yields something satisfying to you when you finish. Simply stepping away from the hard problem for a day or two can re-motivate you when you come back to the hard problem. That time can also give your mind time to process solutions in the background (many people--myself included--have an "a ha!" moment when not thinking directly about a hard problem). And you are still being productive, moving towards the end goal. You had to make a GUI anyway at some point. Might as well be when you are stuck on the hard thing and feeling frustrated.
Getting good at breaking down problems took me many years. I credit my physics education as being particularly helpful (training thinking of problems & solutions in their extremes and always connecting solutions back to "does it make sense"). But much of the above is also learning my own psychology of how I work and what/when/how I am motivated to work and in the best position psychologically to solve a problem. I expect this isn't too different for many people, but the details can vary from person to person.
A big part of the idea with my system is that you only identify 5 tasks at a time. Anything more then that and it becomes overwhelming. So the idea is to peel off the first 5 actionable tasks from your project(s), deal with those before thinking further about the project.
Yes this implies having a general sense of how to accomplish the project and the tasks involved, but no it does not mean you need to have a master plan with every step mapped out. Every 5 steps you get to re-assess and course correct.
Ideally the project is complete and whatever isn't done will be a next phase you can do in the future. If a project must be over several days you need more planning and you need to get the whole thing done. For your daily driver car you have to complete each phase and have a drivable car at the end of each day, for a project car you can have 42 years (real number for a project car a friend of mine is working on) between starting and a drivable car - but phases are still things you complete in a few hours either way.
I thought it said to define the "next action" for each task.
It makes sense to me - you really just want the next concrete action to get the task moving.
If you had to itemize every part of a project, I think that would lead to a procrastination-evoking roadblock.
If your task was "do your taxes", it would be easier to start with "get the tax form out", than "get the tax form, every other tax form, and list all your itemized deductions".. just to put "do your taxes" on your todo list.
As long as I don't care what project gets completed at what time, I've found a little trick to broadly move the needle. I jokingly call it "Sol's fast five" but the name is actually pretty on point.
I take a step back, look around me, and pick out the first five things I can reasonably achieve in less then a day prioritizing things where I have all the tools and materials at hand. These 5 things are never entire projects, the goal is to maximally decompose the projects until each action is as close to trivial as possible.
Once I have my list of 5 things I stop thinking about anything else and strictly work towards those 5 goals. There is a sense of relief in having reduced the scope and the tasks tend to be finished very quickly. Checking them off the list always feels good.
Once I have completed my 5 items I start a new list and pick out the next five items. This can feel like a huge reward.
I've used this system to great effect in the past few years.