Re:Scrum Sucks by al_borland on Monday January 15, 2024 @01:41PM (#39004388)
On the opposite extreme, our teams use Jira, kind of structure it like Scrum, but don’t do any of the actual planning. It’s complete chaos and we have a similar level of meetings, maybe more, with everyone trying to figure out what’s going on and when things will be done. The go-to is a 30-60 minute daily meeting with each individual project manager for each project. Sometimes there are 3 project managers working on different aspects of the same project, so we have 3 hours of meetings (spread throughout the day) to give the same updates 3 times. Of course, there is no update, because all we do is attend meetings to provide updates.

Occasionally our Scrum Master will put an actual scrum meeting on the calendar, but then talks about whatever he wants, and it never moves the ball forward from an organizational point of view. A retrospective would go a long way; we’ve never had one of those. I bring that up often, as the 1 meeting we should have, if we only have 1 meeting.

I tracked my time meticulously for several years, and when I used it to point out how horrible the current environment is, I was told I was doing too much and should be much my lazy about the tracking, to the point where it becomes meaningless.

Re:Scrum Sucks by therealdrag0 on Monday January 15, 2024 @10:09PM (#39008962)
It sounds like you just have poor leadership or poor PMs. Daily meetings should be 15 min with an extended optional “parking lot” to dig into things and everything else should be adhoc meetings with as few engineers as possible, except a weekly and monthly meetings.

I’m a team lead (not manager) and I get over 50% if my time is builder time and I haven’t measured but I’d guess my teammates are around 80%.