Re:Scrum Sucks
by therealdrag0 on Monday January 15, 2024 @10:09PM
(#39008962)
It sounds like you just have poor leadership or poor PMs. Daily meetings should be 15 min with an extended optional “parking lot” to dig into things and everything else should be adhoc meetings with as few engineers as possible, except a weekly and monthly meetings.
I’m a team lead (not manager) and I get over 50% if my time is builder time and I haven’t measured but I’d guess my teammates are around 80%.
Occasionally our Scrum Master will put an actual scrum meeting on the calendar, but then talks about whatever he wants, and it never moves the ball forward from an organizational point of view. A retrospective would go a long way; we’ve never had one of those. I bring that up often, as the 1 meeting we should have, if we only have 1 meeting.
I tracked my time meticulously for several years, and when I used it to point out how horrible the current environment is, I was told I was doing too much and should be much my lazy about the tracking, to the point where it becomes meaningless.