Once the factory is running, what are the marginal savings if you reduce the number of kW produced?
You can have nuclear for the base load and anything else for the peak load, and it would be better than not having nuclear for the base load.
Re:Spain confirms nuclear power phase-out, extends renewable...
by midasuni on Sunday December 31, 2023 @05:51AM
(#38823122)
How does that help stability? You still need the peakers, unless you propose building excess amounts at massive capital cost to be used for an hour or two a day
If you can’t support peak load with nuclear you have to have variable load like gas or bio or pumped