I suppose, but do you think that was more than 9 hours? Because 9 hours is only 1% of their time.
Plus, he works for MIT. He probably needs to clear his consulting work, which could be quick or not. MIT might have wanted a percentage. And if he wanted to use a grad student to assist him in prep work, negotiating that can add up too.
There are other ways to add to the precontract numbers, but that should be enough.
And that's a huge number of hours for each round.
It's really hard to reach "a good chunk" when compared to 900 hours. I was considering saying 90 hours in my first post.
If MIT wants a cut that's a different issue, and I doubt negotiating that will take particularly long.
There is, AFAIK and based on what I can Google, no universal answer.