Re:The Pentagon’s $52,000 trash can
by mysterydip on Friday June 23, 2023 @09:03AM
(#36446271)
Beyond designing, tooling, and maintaining, there is an amazing time and cost savings to being able to continue to procure existing items.
The amount of paperwork/documentation that has to change, logistics and inventory tracking, plus the battery of tests to check that a new item maintains the same mil standard qualifications as the old.
The amount of paperwork/documentation that has to change, logistics and inventory tracking, plus the battery of tests to check that a new item maintains the same mil standard qualifications as the old.