Re:Why the Progress Bar Is Lying to You by sofal on Monday February 27, 2012 @06:01PM (#3641046)
The file download was a bad example. I understand the file download progress bar to mean how much of the file I have downloaded. No more, no less. Next to that progress bar is the current rate and an estimate of the remaining time. This is not what frustrates me. What frustrates me is a progress bar for an installation task that sits at 99% or 100% for about the same amount of time it took to get there in the first place. I'm skeptical that this kind of problem happens merely because the last task happens to be unpredictably long every single time.

I'm betting most of the problems are less about variance in execution time and more about measuring the right tasks at the right granularity.

Re:Why the Progress Bar Is Lying to You by donall on Monday February 27, 2012 @10:08PM (#3641696)
I agree that the download was a particularly bad example, but I think the same argument can apply to any progress bar. As a programmer, I always measure progress as the percentage of tasks completed, whether that is bit downloaded, modules installed, mappers finished mapping, etc.

The mapper example is actually particularly pertinent. Hadoop's GUI shows me the progress of my M/R jobs with a bar, but it is as dependent on the amount of other tasks running on the cluster as downloading a file is dependent on the traffic in the network. There is no sane way to accurately estimate the amount of time a M/R job is going to take a priori, as far as I know. A stochastic method would be too variable and a method playing clever tricks with psychology seems especially insidious, from an engineer's perspective. You might as well replace it with an "Are we there yet?" button that responds to you in a soothing voice "Not much longer now".

Re:Why the Progress Bar Is Lying to You by azov on Monday February 27, 2012 @05:57PM (#3641036)
I don't expect progress bar to accurately predict time - it's there to show progress. The obvious way of implementing it is to split the task into milestones of some sort and display how many are completed. It helps if there's enough milestones so that the bar looks smooth and each one takes roughly the same time, but it doesn't have to be.

Even for time estimates - I don't sit and watch the bar move from start to end. I'll look at it for a few seconds, notice how fast it moves, and go do something else. That "psychologically friendly" progress bar that starts slowly and accelerates will do nothing but confuse me.

Re:Why the Progress Bar Is Lying to You by pithon on Monday February 27, 2012 @06:20PM (#3641096)
Well I guess the implicit assumption is that the rate of progress is relatively constant - hence proportional to time.
Re:Why the Progress Bar Is Lying to You by js2 on Monday February 27, 2012 @05:34PM (#3640956)
Another approach is doing away with the progress bar altogether. :-) Apple used to have a boot progress bar. At one point, it worked by keeping how long the _previous_ boot took, then on the next boot it just scaled the progress bar to complete in the same amount of time.

With respect to download progress bars, one approach is to use an exponential moving average:

http://stackoverflow.com/questions/933242/smart-progress-bar...

Re:Why the Progress Bar Is Lying to You by wtracy on Monday February 27, 2012 @05:31PM (#3640943)
Here's the research mentioned in the article: http://www.chrisharrison.net/projects/progressbars/ProgBarHa...

Briefly, they took a process that proceeded linearly, applied an arbitrary function to the current progress, and displayed the result in the progress bar.

The conclusion is that time taken is perceived as less when the progress appears to start slowly and then accelerate, even when the actual total time taken is the same.

Re:Why the Progress Bar Is Lying to You by tzs on Monday February 27, 2012 @07:07PM (#3641214)
Two things I've half seriously considered if I ever need to do a progress bar:

1. Make the errors amusing to the user. For instance, if the operation goes over the estimate, go ahead and fill the progress bar to 100%. Then pause a second, and act embarrassed. Change the progress text to something like "Uhm...err...well, this is a bit embarrassing...", then go one to explain it's taking a little longer then expected.

Then say something like "OH MY GOD! THAT SPIDER BEHIND YOU IS THE BIGGEST I'VE EVER SEEN!!!". While the user is presumably turned around to check out the giant spider, drop the bar back to 80% or so, and pretend nothing ever happened.

2. Report progress bar inaccuracy back to the server, which can look and see if there thing is being consistently off in one direction and make a correction factor available to subsequent users of my software.

Might also stats to the user at the end of the operation, telling them things like "This progress bar was off by 10%. The average user's progress bar was off by 20%. Congratulations! Your computer was more reliable and consistent than average!"

Re:Why the Progress Bar Is Lying to You by morsch on Monday February 27, 2012 @07:57PM (#3641332)
I would find option 1 and possibly option 2 off-putting in anything other than a game. I realise progress bars are a more-or-less rough estimate (ie. "they lie"). Just make it as good an estimate as you can reasonably do, and that's fine.

For bonus points, display the underlying data in some way so that I can draw my own conclusions, supplanted with "sidechannel" information I am likely to have, e.g. previous experience with the process if nothing else. Extra bonus points if you make this information optionally visible so that I can tune it out if I don't need it and my mom doesn't get confused. I really like modern copy dialogs in that regard (and not-so-modern ones on decent file managers).

If you can't make the estimate reasonable at all, don't make a progress bar and display progress in some other manner instead. E.g. if you are copying files, and you have no way of knowing how large each file is, consider simply putting down a simple count ("Files copied: x/y") and if at all possible some indication that the program is progressing at all ("Current speed: x MB/s").

Finally, please do try to add some kind of progress information for any task that can take more than a few seconds. It's incredibly frustrating to stare at a "busy" mouse pointer[1], having to guess whether an application has locked up or if it's just taking extremely long. If you get it wrong, you usually end up re-trying and being faced with the same situation. I have had to play detective around applications misbehaving that way, and having to use top, iotop, etc. to determine whether an app is using CPU, hard disk or network resources is both a lot of work and non-conclusive (not to mention beyond the capabilities of most users).

(This started out as a short reply and ended up quite being a more general rant; the second time this has happened to me tonight. Sorry about that.)

[1] Though terminal utilities are often just as bad, because they're not just designed with interactive usage in mind. However, each individual terminal utility tends to do less, which means complex process are broken down anyway, which yields some progress information.

Re:Why the Progress Bar Is Lying to You by cbr on Monday February 27, 2012 @06:30PM (#3641132)
Several people [1][2] are saying they think of the progress bar as bring about how much of the work (bytes downloaded, milestones completed) is done. It doesn't matter how you interpret the bar: what matters is what your users will think, and most people see the bar as indicating time.

[1] http://news.ycombinator.com/item?id=3641046

[2] http://news.ycombinator.com/item?id=3641036

Re:Why the Progress Bar Is Lying to You by alttag on Monday February 27, 2012 @06:49PM (#3641172)
I agree ... mostly.

One of the examples was bytes downloaded. The reason I, and I suspect other users, interpret that as % downloaded is that in most interfaces (e.g., iTunes, Firefox, Safari), below the download progress bar, it says "XK of YK". (There is also an estimated time remaining, but it's typically not on the left side.)

In other cases (installs), yes it makes sense that the simplest interpretation is time, because that's what we care about when installing: how long until we can use the new shiny widget.

Re:Why the Progress Bar Is Lying to You by ComputerGuru on Monday February 27, 2012 @05:59PM (#3641039)
Very, very interesting piece. At my previous job, I spent perhaps an entire month (plus all-nighters) working on a progress bar for the restore page of a backup program. The catch was it was a multi-stage process, and we wanted one and only one bar to represent the progress as smoothly as possible.

It's by far one of the most deceivingly difficult problems I've worked on. If anyone cares for more info, this is what the restore process looked like:

   * Single thread that determines the list of files that need to be restored, asynchronously feeding to
   * Multiple threads that download the files from our servers as ZIP files, then each queue their results to either
    * A thread pool with a dynamically adjusted number of worker threads for the unzip and decrypt process, extracting the files to their final destination, OR
    * A different thread pool with a fixed number of threads that does block-level (byte-level differential) restore, which may, when processing a file, need to add files to the first thread mentioned in this list
To pull this off, we had to modify the backup process to store enough info to be able to calculate, immediately when the user presses "start restore," the total number of files to be restored, the total number of files to be downloaded (which may be different because ZIP files can contain many small files to minimize latency and overhead, and also because the byte-level differential backup has "backup run" outputs), the total bytes to be restored, the total bytes to be downloaded, the total bytes to be unzipped, etc. etc. etc.

The progress bar had to move "smoothly enough" across the entire backup. If you're restoring a hundred and one files, 100 of which are tiny and in a single zip file, and the 101st being a huge differentially-backed-up file, the 101st will take forever and the progress should reflect that. For multi-GB restores, the math could give you 100% (with rounding) for over 10 minutes - need to jam the progress bar at 99% until it's actually done or you'll get complaints. Likewise can't keep it stuck at 0% even if it rounds down to 0% or you'll get complaints.

At the end of the day, the formula I came up with weighted for the following:

   * The number of files to be downloaded
   * The number of files to be restored
   * The size of the files to be restored
   * The number of files to be decrypted
   * The number of files to be differentially restored
   * The number of files required to differentially restore a single file
   * The size of the files required to differentially restore a single file
   * The size of files cached locally that can skip download
   * The number of files coalesced in a single ZIP archive
   * The destination drive (externals are slower than internals)
   * The average download speed
Fringe cases such as attempting to restore a single file that was contained in a single ZIP with a hundred other files when tested with a naïve algorithm would end up giving negative progress as if you adjust for the factors listed above you'll end up needing to factor in a (relatively) "huge" number of bytes for download while you're actually only grabbing a single "small" file from the ZIP. Basically, if you adjust the weight of one factor for one case, you'll end up getting non-smooth progress bars for other cases as a result. Took a lot of charting, a lot of trial and error, a lot of user feedback (each time from people that had never participated in the test before to prevent any sort of bias or preconceived notions) to finally get it right. That code is now classified as "no one touch it, no matter how trivial (you think) a bug you found would be fix."

So, yes. Progress bars lie. It takes a shitload of work to make pull these lies off, and if they told the truth, your users would really make sure you never heard the end of it. Even if you've already technically done 80% of the work, if only 20% of the required time has elapsed, that progress bar had damn well not say 80%. Or 20% either, for that matter.

Re:Why the Progress Bar Is Lying to You by bdunbar on Monday February 27, 2012 @06:36PM (#3641143)
a progress bar for the restore page of a backup program

Maybe I'm unusual. Aside from tar'ing data to tape on elderly 'nix machines, years ago, nearly all of the backup / restore jobs that I've done have been for work - tape libraries, dedicated servers, etc.

I don't _care_ about progress bars, accurate or not. I'm not going to watch a nifty GUI screen for hours - kick off the job, give me an estimate, notify me when done.

People really care enough to make it an item worth that much skull sweat? Weird.

Re:Why the Progress Bar Is Lying to You by ComputerGuru on Monday February 27, 2012 @06:47PM (#3641169)
People really care enough to make it an item worth that much skull sweat? Weird.

Unfortunately, yes. The B2C desktop software market is such a cutthroat environment both in terms of what users expect and how much competition there is. It's an entirely different beast and the devil really is in the details. For some reason, bloggers, software review sites, magazines, etc. will really run desktop software through the mill and pick at the nitty-gritties in a way that they don't with webapps. Perhaps because with webapps the user experience is rather ephemeral and can be easily patched or fixed whereas with desktop apps everything has a very "final" feel to it.

Re:Why the Progress Bar Is Lying to You by bdunbar on Monday February 27, 2012 @06:39PM (#3641150)
Irrelevant Digression:

The niftiest progress bar I've ever seen wasn't a progress bar.

It was a little morality play.

As the game installed a dinosaur slowly bounced across the installer window and _ate_ a hapless user .. who didn't send in his registration card.

Still remember that, seventeen years later.

Re:Why the Progress Bar Is Lying to You by sukuriant on Monday February 27, 2012 @06:45PM (#3641164)
Unfortunately, Atari owns a patent on little games loaded for someone to play while a larger bit of data is being loaded.
Re:Why the Progress Bar Is Lying to You by morsch on Monday February 27, 2012 @08:05PM (#3641348)
Bah. What a horrible patent of an obvious idea. At least it's an old bad patent: the one linked to in a cousin post was filed in 1995, so its twenty years are over in 2015. I guess there will still be loading screens in 2015.
Re:Why the Progress Bar Is Lying to You by bdunbar on Monday February 27, 2012 @07:37PM (#3641283)
This wasn't a game, merely an animation. Purposefully crude drawings to go with the story line.

Pity. If Oracle has wee little cartoon dinosaur mayhem I'd be a happier guy.

Re:Why the Progress Bar Is Lying to You by bo1024 on Monday February 27, 2012 @06:56PM (#3641189)
What, seriously?? How the hell can you patent that??
Re:Why the Progress Bar Is Lying to You by krambs on Monday February 27, 2012 @07:00PM (#3641198)
I would love to see that patent. I have a hard time imagining it would be enforceable.
Re:Why the Progress Bar Is Lying to You by icebraining on Monday February 27, 2012 @07:51PM (#3641321)
It's probably this: http://patft.uspto.gov/netacgi/nph-Parser?Sect1=PTO1&Sec...

It's actually issued to Namco, but it seems to describe exactly that.

I think I have a PSOne Namco game with a preloader, possibly Tekken. I never so much as dreamed that was patented, though.

Re:Why the Progress Bar Is Lying to You by sukuriant on Monday February 27, 2012 @10:07PM (#3641693)
Yes, sorry. I was going off memory there. That's the patent I recall. Would update, but no longer have edit ability.
Re:Why the Progress Bar Is Lying to You by makmanalp on Monday February 27, 2012 @07:13PM (#3641228)
Well, if bdunbar is correct there may be prior art.
Re:Why the Progress Bar Is Lying to You by icebraining on Monday February 27, 2012 @07:41PM (#3641295)
What bdunbar described is more an animation than a game.
Re:Why the Progress Bar Is Lying to You by InclinedPlane on Monday February 27, 2012 @06:51PM (#3641174)
Suggestion: use a succession of checkpoints (including start and finish) to keep track of overall progress. Then create a database of checkpoints along with timestamps (either from historical runs if this is a process that normally runs often for an individual user or from a few sets of lab runs if this is a one time thing like an installation). Now, calibrate the checkpoints to the expected position on an "ideal" progress bar given the historical data and present that to the user.
Re:Why the Progress Bar Is Lying to You by r00fus on Monday February 27, 2012 @07:05PM (#3641208)
I had a similar problem with a customer that wanted a smooth progressing progress bar for periodic sync process where I had no idea how many actual entries were being sync'd on any given run (the cost of finding out == cost to sync)... the number was almost always more than the previous time.

So what I did was simply calculate how long the previous run took, add 10%, use that as my new baseline, and show progress based on the percentage between. Often this would mean the progress bar went straight from 93% to complete - but this was preferred (better than stalling at 100% for minutes at a time).

Eventually we automated the sync process, and the customer was happier looking at the occasional exception report instead of a progress bar.

Re:Why the Progress Bar Is Lying to You by dreeves on Monday February 27, 2012 @07:25PM (#3641256)
For anyone who missed it, here's an idea for making progress bars way more fun: http://xkcd.com/1017

And I'll throw in this one just because it's funny (and quite on-topic): http://xkcd.com/612/

Re:Why the Progress Bar Is Lying to You by noblethrasher on Monday February 27, 2012 @05:28PM (#3640934)
Re:Why the Progress Bar Is Lying to You by georgieporgie on Monday February 27, 2012 @06:09PM (#3641068)
It seems to me that a modern operating system, which might be used on several different networks throughout the day, and which may offer a variety of different hardware configurations, should be able to provide information to applications which could be useful in calculating this sort of thing. Things like latency, typical data throughput (network and local storage), etc.
Re:Why the Progress Bar Is Lying to You by ragweed on Monday February 27, 2012 @09:51PM (#3641660)
For some algorithims, it can be difficult to predict how much time will be spent processing a particular hunk of data even when it's instantaneously accessible.