Valleys are useful as they provide a large volume that can be capped with relative ease.
An underground reservoir requires a large volume to be excavated (or a pre existing cave system) and a deeper chamber again for the turbines to powered by the fall .. to yet another deeper underground reservoir.
I'm not saying this is impossible, I stating that as an engineering venture (actual civil engineering not software "engineering") there are some real challenges and greater ones than using existing topography.
You're hand waving a lot away with your comment.
Could you provide some more info for this? My understanding was a lot of the sites that could do this, have done. If that's not the case it'd be good to see what the real picture is.
https://re100.eng.anu.edu.au/global/
Probably won't happen because batteries will be even cheaper by the time much of it is developed.
In this case, from the study:
> None of the PHES sites discussed in this study have been the subject of geological, hydrological, environmental, heritage and other studies, and it is not known whether any particular site would be suitable. The commercial feasibility of developing these sites is unknown.
There it is. Always so concerned" about whatever imaginary downside alternatives have, but completely credulous about nuclear which has failed over and over again.
You're claiming without any evidence whatsoever that at least 99% of geographically appropriate sites are unusable.
It's not a downside. It's a problem with the study.
> completely credulous about nuclear which has failed over and over again
Can you cite where I've done this?
> You're claiming without any evidence whatsoever that at least 99% of geographically appropriate sites are unusable.
And where I've done this?
In a nutshell, you put in more generators to maximise your peak generation capacity, and operate them only when required.