Re:Why are nuclear power construction costs so high? Part II...
by epistasis on Friday September 30, 2022 @05:49PM
(#33041253)
> They lobbied PG&E with a study they paid for that, under the insane assumption that california's energy use would _decrease_ in the future, concluded renewables would be cheaper
Usage in California has gone down, and renewables are cheaper, just look at the blog series in the original article. Calling these well-known and irrefutable facts "insane" does not bode well for the plethora of other questionable assertions in your comment. For the usage:
https://www.energy.ca.gov/data-reports/energy-almanac/califo...
Re:Why are nuclear power construction costs so high? Part II...
by andbberger on Friday September 30, 2022 @05:53PM
(#33041288)
energy austerity is incompatible with climate change mitigations. eg thermal industrial processes currently powered by fossil fuels need to be moved to grid power.
their proposal was to spend $2B to lose 2GW of carbon free baseline power
everything in my statement is true and based on documents in the public record
Re:Why are nuclear power construction costs so high? Part II...
by epistasis on Friday September 30, 2022 @05:59PM
(#33041357)
I have followed the documents carefully, doing a deep dive on Diablo Canyon around 2020, but I do not recognize your framing of the situation as anywhere close to accurate. I'm also not sure what you mean when you are referring to energy austerity in your comment, of what $2B you are talking about.
Re:Why are nuclear power construction costs so high? Part II...
by andbberger on Friday September 30, 2022 @06:11PM
(#33041458)
$2B is the cost to decommission diablo canyon. energy austerity is planning to use less energy when we know for a fact we're going to need more.
don't underestimate the negative influence of "environmentalists"