Re:Day ahead electricity prices for EU by jillesvangurp on Saturday August 27, 2022 @10:11AM (#32619222)
Already exists. The main limitation is the number of cables and GW capacity.Also ramping up cable production has a bit of latency and installing them even more. And it's capital intensive and only makes sense when electricity prices are high. They are right now but that's not a permanent situation.
Re:Day ahead electricity prices for EU by bombcar on Saturday August 27, 2022 @10:39AM (#32619510)
And the problem with building massive interconnects that are rarely used is that it’s not economical to do so. They need to be encouraged by outside means.