News for hackers. Stuff that matters.
Re:Intel expands Oregon Fab building; 18A Node now 2024 by thunderbird120 on Sunday August 07, 2022 @06:15AM (#32375306)
At least in theory both 20A and 18A are significantly superior to what TSMC has planned for its initial N2 node. Backside power delivery is the largest single factor but Intel will also likely have a density advantage on top of that. TSMC's N2 is a very conservative node.
Re:Intel expands Oregon Fab building; 18A Node now 2024 by senttoschool on Sunday August 07, 2022 @07:54AM (#32375779)
I don't think so.

Intel's roadmap is Intel 4 (TSMC N5P) --> 20A (TSMC N3) --> 18A (TSMC N3E)

Re:Intel expands Oregon Fab building; 18A Node now 2024 by andy_ppp on Sunday August 07, 2022 @05:25PM (#32380072)
Um, can we just talk about feature density… as I understand it backside power is a huge breakthrough and Intel will probably be a year before TSMC get to similar feature size with technology that is much more uncertain.