Re:Northvolt assembles first lithium-ion battery cell at Swe... by rekoil on Thursday December 30, 2021 @05:27AM (#29735484)
It is true that we have a lot of hydro power, however it is pretty much fully utilised as it stands (they're talking about hundreds of additional MW when they talk about expansion, which will not do much in the grand scheme of things), and with all of this additional load, as well as fast ongoing electrification of our vehicles, it seems unlikely that additional wind farms will be able to pick up the slack.

Obviously I'm hoping I'm wrong here, because the alternative is nuclear which is apparently still a no-no word in most political circuits over here, and thus is unlikely to happen. Even if nuclear were to happen, ramping it upp will take much longer than the pace of this additional industry and electrification...

I'm worried we're going to end up in a crisis where we have to build up capacity quickly, and the only reliable and fast way of doing so is through fossil fuels.

Re:Northvolt assembles first lithium-ion battery cell at Swe... by londons_explore on Thursday December 30, 2021 @09:17AM (#29736857)
Hydro in general has two metrics that matter. How many MWh can you generate per year (pretty much, how much water falls in a year), and how much MW can you generate at any given moment (ie. How fast can the water come out of the lake at top speed).

As the price of electricity varies more and more hour to hour, it becomes worth installing new generators to generate more MW, so you can do all the generation in a short time window to get the best price.

Re:Northvolt assembles first lithium-ion battery cell at Swe... by sandos on Friday December 31, 2021 @06:43AM (#29747115)
But there are strict limits as to how much water you can release downstream, too.
Re:Northvolt assembles first lithium-ion battery cell at Swe... by tmikaeld on Thursday December 30, 2021 @05:30AM (#29735510)
According to "Energikommissionen"s research, Swedish hydro could be greatly built out with minimal effects on the environment.

[0] (2015 article) https://www.nyteknik.se/opinion/dags-att-bygga-ut-vattenkraf...

Re:Northvolt assembles first lithium-ion battery cell at Swe... by rekoil on Thursday December 30, 2021 @05:33AM (#29735526)
I found that article as well, it cites no numbers, and according to Vattenfall the plan is for an additional 600MW by 2023... Hardly enough given everything discussed here.

https://group.vattenfall.com/se/nyheter-och-press/nyheter/20...

Re:Northvolt assembles first lithium-ion battery cell at Swe... by tmikaeld on Thursday December 30, 2021 @05:38AM (#29735549)
Yes, because I couldn't find the Energikommissionen official publications any more, same goes for net stability documents being removed from government sites (from 2013).
Re:Northvolt assembles first lithium-ion battery cell at Swe... by whizzter on Thursday December 30, 2021 @08:21AM (#29736494)
I'm actually cautiously optimistic for once, the MP ("Greens") rage-quit out of the administration opened up for S to skip the MP imposed blockade of the long-term storage decision. If that finally gets done it at least removes some uncertainty if any company wants to start making plans for a new plant (Yes, it's almost idealistically hopeful but the blockade did impose a lot of uncertainty).