Nothing happens if you remember that your new capacity limit per DC supply is 50% of the actual limit, and you're 100% confident that either of your supplies can seamlessly handle their load suddenly increasing by 100%.
I've seen more than one failure in a DC where they wired it up as you described, had a whole power side fail, followed by the other side promptly also failing because it couldn't handle the sudden new load placed on it.
Normally this is factored into the Rack you buy from a hardware provider, they will tell you that you have 10A or 16A on each feed, if you exceed that: it will work, but you are overloading their feed and they might complain about it.
Obviously people can operate things however they want, but you wont get a tier 3 classification with that setup.
But, point taken: yes your power feed should be running at <50%. But that just means you treat 50% as 100% just like any resource.
Mostly this is outsourced to the datacenter provider; they'll give you a per side rating. (usually 10A or 16A) which also matches the cooling profile of the cabinet.
However, with their comment DC == Data Center, not Direct Current.
DC = Datacenter? makes no sense, so my head replaced it with "Power Supply" instead of "DC Supply", second sentence does make sense as being datacenter though.
This is all local scale. Your setup would not survive a data center scale power outage. At scale power outages are datacenter scale.
Data centers lose supply lines. They lose transformers. Sometimes they lose primary feed and secondary feed at the same time. Automatic transfer switches cannot be tested periodically i.e. they are typically tested once. Testing them is not "fire up a generator and see if we can draw from it"
It is cheaper to design a system that must be up which accounts for a data center being totally down and a portion of the system being totally unavailable than to add more datacenter mitigations.
And to top it off each rack had its own smaller UPS at the bottom and top, fed off both rails, and each server was fed from both.
We never had a power issue there; in fact SDGE would ask them to throw to the generators during potential brown-out conditions.
Of course this was a datacenter that was a former General Atomics setup iirc ...
Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in?
Again, this is all pure speculation: I have absolutely no idea of the exact failure, nor how their infrastructure is held together - this is all just speculation for the hell of it :)
That's ATS. It is not really advisable to test their under load performance because the failure of an ATS would be catastrophic. ATS typically would be tested at the installation and after that their parameters would be monitored.
Replacing a functional in line ATS would be a 9-12 months long project.
> Also, there are banks of batteries and generators in between the power company cables and the kit: did they not kick-in?
At high energy you are pretty much always going to use an ATS.
Because that would mean no power at all to the DC and no way to get it back? (I am completely ignorant on this topic)
While most of smarts in the ATS are in the electronics, the really nasty failures come from the mechanical part.
At the end of the day a high energy ATS looks just like a switch behind a meter in your house. There's a lip that goes from one position to another, except in a high energy ATS the lip is big and when the transfer occurs it slams from one source to another.
There are only so many of those physical slams that it can withstand to being with so you want to minimize that number.
The second failure mode is that after transfer to non-main source, the lip can get stuck there, making it impossible to switch back on the main. [Once I have seem the lip melt into the secondary position. While I thought it was weird, the guys from the power company said it is not that uncommon.] This creates a massive problem as the non-main source is typically not designed for long term 24x7 operation. So now you are stuck on a secondary feeding system and you cant just transfer to main without de-energizing the system i.e. taking the power out of the entire data center.
I've had bad power supplies fry out taking the whole power circuit with it, and thus half (or whatever fraction) of the rack's power. I've also had bad power supplies bring down the whole machine as they shunted everything internal too.
When things go bad, anything can happen. You can provide the best effort, and it'll usually work as expected, but there will always be something that can overcome your best efforts.
Citation needed - the same issue with testing, data races and expensive bandwidth come up.
Software is much easier than hardware. If you are to start a project today in this kind of hardware, you will be operating it in 2029, without changes.
I don't think this makes sense, you are using the three statements "Software is cheaper", "Software takes less time" and "software is easier" as if they all mean the same thing, and proving one means proving all of them.
Hardware takes a long time, okay, that does not mean it's expensive. Building a hydroelectric dam takes 20 years, but it provides the cheapest source of electricity that ever existed. Ships can take a decade from order to delivery, they are the cheapest mode of transport.
For big DC workloads, it is usually, though not always, better to take the higher failure rate than add redundancy.
Actually, now that I type that it makes sense. Scaling a few tens of dollars to a bajillion servers on the off-chance that you get an inbound power failure (quite rare I'd reckon) might cost more than what they'd lose if it does actually fail.
So yeah, they're potentially just balancing the risk here and minimising cost on the hardware.
Edit: changed grammar a bit.
More modular and a lot less copper at 10x the voltage. Still a lot of copper.
Perhaps we are going to discover how AWS produces such lofty margins by way of their next RCA publication.
My guess is that they cheaped out in having redundant PSUs to get you to use multiple availability zones. (More zones = more revenue)
Even a single PSU shouldn’t be an issue if they plugged in an ATS switch though.
1. Dual power in each server/device - One PSU was powered by one outlet, the other PSU by a different one with a different source meaning that we can lose a single power supply/circuit and nothing happens 2. Dual network (at minimum) - For the same reasons as above since the switches didn't always have dual power in them.
I've only had a DC fail once when the engineer was performing work on the power circuitry for the DC and thought he was taking down one, but was in fact the wrong one and took both power circuits down at the same time.
However, a power cut (in the traditional sense where the supplier has a failure so nothing comes in over the wire) should have literally zero effect!
What am I missing?
I've never worked anywhere with Amazon's budget so why are they not handling this? Is it more than just the imcoming supply being down?