The signalling barely works at the best of times. It's literally a museum of technologies, from the pneumatic to the electronic, and it's one of the most common points of failure on the network.
But when it's working it's been improved to the point where there's almost no spare line capacity at peak times.
And if you're making new tunnels it's so difficult and expensive to get a Tunnel Boring Machine into place that it makes no sense to bore short sections.
Crossrail is supposed to be London's east/west express line. Obviously it's not ideal for District Line users, but it should free up some peak hour capacity for Circle and Hammersmith & City journeys which may translate to fewer District/Circle passengers.
There's also talk of a north/south Crossrail 2.0, but that's unlikely to happen for decades.
There are overground express sections on the Piccadilly (District) and Metropolitan (Jubilee) lines but they all keep the lines separate.
There may well not be room for a tunnelled express in the central area. If it were up to me, I'd consider installing a good urban tram link from (say) Earls Court to Embankment.
Yep. Not sure if I miss-worded something but that definitely wasn't what I was implying, just the opposite. That the whole point of HS2 is to separate the fast and slow trains so you don't need passing places (either at stations or otherwise) and so can actually run more trains on both the new HS [line and the existing line.
[0] I don't live in the UK, so I didn't know that yet despite being a railway nerd.
I think you can read section 2 of [1], and the start of section 3. With enough trains, you can still fill up a four-track railway.
[1] https://assets.publishing.service.gov.uk/government/uploads/...
Scheduling/timetabling is a wickedly hard problem, especially in a system like a railway, it's the sort of thing people get Maths and CS PhDs in. The contstraints that you have to solve are complex and interconnected and are part of a bigger network, and you are also trying to please a lot of people with very different (often contradictory) needs.
* stop more or less everywhere
* stop only at larger stations
* even/odd stopping at small stations
The scheduling already seems pretty clever, and that's just from observing as a passenger. I suspect behind the scenes there's a whole lot more to it that's not obvious to someone who is just trying to get to work.For example, in the simple case where the stations are evenly spaced, if train B arrives at station 1 at the same time that train A arrives at station 2, then they will leave at the same time and arrive at stations 3 and 4 respectively at the same time, and never catch up with each other.
However on something like the underground that would complicate the "turn up and go" approach that most people take to the tube if you start skipping different sets of stations on different trains.
It's something that's done, but I'm not sure how well it would scale on the tube if you did it a lot. Each train would need to miss roughly the same number of stops to prevent blockages or you need more passing places. With the small gaps between many tube trains the margin of error for scheduling can be very small.
I think it's one of those things that works, but the advantage for the vast majority of people would be pretty small compared to the complexity and added fragility it would introduce if you tried to do it a lot.
In NY, the expresses are easier to understand because the rules are very simple.
This is one of the big missunderstandings about the HS2 line. Politicians focus on the shorter journey times, but the big win is actually increased capacity. HS2 will take the express trains off the normal line. With just HS trains on that line you can run more of them than you can if you have stopping trains sharing the track. In addition you should actually be able to run more stopping trains faster since they don't need to be fitted in around the expresses with no extended stops waiting for a delayed express to pass at a station or passing place.