Btw, other countries determined the maglev tech to be uneconomical. I think India and Saudi Arabia and some other places were interested but ultimately nothing became of it.
Maglev is complex because:
* it guarantees you can't run services beyond the limit of the new-built track,
* the extra speed comes with higher operational costs (because drag, so you need the time saving to increase modal shift), and
* higher construction costs (to get the higher speeds, you need to build it with very large radii corners, which limits your ability to choose one's route to minimise significant structures; and if you want city-centre stations, you have no choice but to build a new line all the way in, and it turns out that acquiring land in cities is expensive).
I wouldn't _totally_ write off maglev, but there are relatively few corridors which align to make all of this worthwhile.
My understanding about maglev operational costs is that the energy consumption of each service is higher (due to the need to maintain the electromagnets, which end up consuming more energy than is used to overcome the rolling resistance of steel-on-steel), though the overall operating costs are hard to judge (especially when the only operational line is both short and there is little in the way of public data about its costs).
I don't know if beaming power is practical. Tesla was working on it long before we were born.