Re:Starlink dishes go into “thermal shutdown” once they hit ...
by HWR_14 on Sunday June 20, 2021 @01:44AM
(#27567461)
> SpaceX is known for using less than ideal products during test phases and working in parallel for the improved/final versions
That works for building rockets one at a time. It works less so for mass producing consumer electronics. Lines cost a lot of money to set up, and economies of scale exist.
I mean they practically used a water tower to test their starship engines. while in parallel they worked for rocket design just to test the first flight/landing and yet in parallel another deisgn for orbital flight tests etc. It seems a waste but this aproach has allowed them to be years ahead of ULA in rocket design. In this case I think they have demonstrated how they work and it's fair to assume that these problems are not engineering miscalculations but deliberate "go with the fastest thing you can test" decisions.