And yes, CCS supports either 400 or 800V charging, but that's seamlessly negotiated by the car once connected, I don't see that as a problem here.
Your going to need a Megawatt for reasonable charge times, CCS tops out a 400kw at 1000v and 400amps with liquid cooled cables and connectors.
BTW a diesel truck pump puts out about the equivalent of 6 megawatts after efficiencies are normalized.
There will need to be stall where a semi can park for 8 hours using a charger.
Local deliver makes sense also city buses obviously and thats already happening. Long haul will need a lot more charging infrastructure to make sense.
The US has settled on CCS type 1 for fast DC charging, most new cars support it.
There is CHAdeMO a Japanese standard but that connector is on its way out in the US.
And then Tesla does it's own thing but there are adapters available.
I think it is a solved problem, if you don't want a Tesla a modern EV will have a CCS plug that fits both CCS and J1772. And if you want a Tesla you either get adapters or use Tesla's chargers.
Cobalt mining has problems with child labor.
If you want fast charging for instance you need a special vehicle with a high voltage system. Those are not super common right now, although it’s getting better.
Really this is the biggest unsolved part of EV’s.