If you use the station everyday, you notice these things.
In my 25-floor condo, the company that did our elevator renovation was able to replace 3 elevators over the course of 1 year. They were done in sequence, not parallel, so we had full use of 2 elevators the entire duration.
* https://www.google.com/maps/place/265+Runnymede+Rd,+Toronto,...
* Opposite end: https://www.google.com/maps/place/260+Kennedy+Ave,+Toronto,+...
The subway in that area was built in the 1960s using (AFAIK) a cut-and-cover method, so it's not every deep below the surface:
* https://en.wikipedia.org/wiki/Line_2_Bloor–Danforth#Subway_c...
* https://en.wikipedia.org/wiki/Tunnel#Cut-and-cover
The original criticizing GP also assumes that it was a "simple renovation": is this a valid assumption? For example, how do you get a bunch of new elevators installed:
* https://ttc.ca/Service_Advisories/Construction/Runnymede_EA....
Drilling multiple elevator shafts seems more than a "simple renovation".
5-7 years remind me of the Sofia metro (Bulgaria) during the Soviet Bloc era. It was officially under construction for like 20 years but in practice, the budget just wasn't there so the works went forward veeeeeery slowly, in some years literally nothing was done.
My criticism is purely: we don’t know better so let’s avoid throwing numbers out there.
I’m sure there’s bureaucratic inefficiency. But there’s always so much nonsense that gets appended to the criticism.