* https://www.google.com/maps/place/265+Runnymede+Rd,+Toronto,...
* Opposite end: https://www.google.com/maps/place/260+Kennedy+Ave,+Toronto,+...
The subway in that area was built in the 1960s using (AFAIK) a cut-and-cover method, so it's not every deep below the surface:
* https://en.wikipedia.org/wiki/Line_2_Bloor–Danforth#Subway_c...
* https://en.wikipedia.org/wiki/Tunnel#Cut-and-cover
The original criticizing GP also assumes that it was a "simple renovation": is this a valid assumption? For example, how do you get a bunch of new elevators installed:
* https://ttc.ca/Service_Advisories/Construction/Runnymede_EA....
Drilling multiple elevator shafts seems more than a "simple renovation".
5-7 years remind me of the Sofia metro (Bulgaria) during the Soviet Bloc era. It was officially under construction for like 20 years but in practice, the budget just wasn't there so the works went forward veeeeeery slowly, in some years literally nothing was done.
My criticism is purely: we don’t know better so let’s avoid throwing numbers out there.