The caveat being the South Australia has a power grid that is sometimes a contender for the worst managed (and most expensive) electricity grid globally. Or at least highly challenging to get it working smoothly.
So the battery is a huge success story and we'll see more like it - but the conditions where it succeeded are not necessarily where the gird wants to be.
That's a strong claim. Wholesale electricity prices in South Australia are currently around USD$45/MWh.
My understanding is that South Australia has historically always had the highest electricity prices in Australia due to dependence on gas generation within a small market controlled by two players who took advantage of their market power, but that this is starting to reverse now due to the shift to more renewables over the last decade, and South Australia may now be on track to have the cheapest electricity in Australia.
Similarly the Tesla plant is doing exactly what it said it was going to do, when it was supposed to be finished, within the budget it had, and AFAIK is making money. You're asserting that it can't scale because it... worked?!
As far as the Pakistani misdesign, yeah, I'm sure that's going to happen too. Nothing works perfectly.
Nonetheless this seems like a pretty oddly constructed list of reasons why solar is "much worse in production". It seems to my eyes like it's doing much better than expected.
Ordinary 60 or 72-cell panels are DEAD SIMPLE in their construction. It's a sandwich of a backing material, encapsulation for the cells and soldering, glass in front, with an aluminum frame and a junction box on the rear.
Solyndra "panels" are fragile, hard to transport, hard to mount, everything about them was a pain in the ass.
https://english.elpais.com/economy_and_business/2020-06-29/s...
apparently you also think the chinese government using its people's money to sell panels at a loss makes the panel cost less to produce, proving the opposite of his point?
do you actually have a point, beyond 'your point is false because of this fake argument i made up?'
With some basic equipment like rolling carts with sprayers and squeegees on extension sticks, how many individual 72-cell sized panels (1.99 x 0.99 meter size) can one person clean in one day? Multiply by probably 4 to 6 full time staff positions.
> It required one litre of water to clean, each of 400,000 installed panels. A total 15 days cleaning cycle required, 124 million litres of water enough to sustain 9000 people, while rain in Cholistan desert is rare and far between. Providing such huge amount of water in desert terrain, became a challenging and daunting task for management team. Besides, the manual cleaning methods allowed setting of dust before it was re-cleaned.
I'm not sure the phrase 'temperature differences' exhibits a profound understanding of evaporation.
If a location gets 45c (as per GP's reference) during the day, this doesn't necessarily speak to night time temperatures.
I'll note that Bahawalpur's temperature profile is available at:
https://weather-and-climate.com/average-monthly-Rainfall-Tem...
For the three hottest months of the year the average lower temperature is around 25C, which suggests quite a low evaporation rate overnight.
It would be great if you could provide some more detailed insights.
Have a swarm of these and cleaning will not be an issue.
I would imagine another challenge is the transporation costs. The nearest fresh water source appears to be Sutlej River ~18 KM straightline. The nearest seawater source appears to be the Arabian Sea, ~800 KM straightline.
The cost to a problem like this would never be labor as that can be trivially automated if it ever gets costly enough. Water is expensive at these scales.
That being said, it's probable that there could be solutions here. Automated scrubber/blower might be able to get most of the efficiency back without the cost (whether integrated into the panel or a robot on a track). Could potentially use any water more judiciously too when needed (moisten a scrub rather than blasting it with water). Don't know enough about the project but I would hope the domain experts responsible for the project would have considered something I only thought about for 30 seconds & there are reasons that they don't do that.
I imagine some glass coating should be cheap enough and efficient solution to implement.
> The nearest seawater source appears to be the Arabian Sea, ~800 KM straightline.
Sure, such plant has to be constructed near seawater source.
http://www.salaryexplorer.com/salary-survey.php?loc=164&loct...
This comes out to ~$97,000 which is how I came up with about $100,000/y.
Just to note this isn't something you do for just one month per year if that's how you came to a factor of ~10.
Some kind of brush is probably what you need for dust.
A valid example of what can go wrong when you pick the wrong technology, don't do small scale trials first, and rely on government oversight. (Refer the Background & Operation section of the wikipedia article -- toe-curlingly alarming, yet ultimately unsurprising.)
They almost definitely should have pursued concentrated solar thermal. It partly solves the 'storage problem', provides power well into the evening, doesn't need more water than they have to clean it, and improves magnificently with high temperatures (the wikipedia article cites the problem of regular 45C days, which are above the 25C optimum temperature for PV panels).
Given all this was known and understood before they broke ground, this sounds like a traditional government project problem -- susceptibility to corruption, vanity, hubris etc.
I don't know why you're trying to turn this into an "obviously govt can't do anything" point. There are plenty of very well-run governments who would have ably foreseen and solved these problems. And no doubt there's any number of private companies who would have screwed up just as badly.
Trying to tar the entire idea of government with Pakistan's performance is pretty bad faith IMO.
You're mis-quoting me. Is this intentional?
I understand paraphrasing, but there's better (and more accurate) ways of doing that.
> I don't know why you're trying to turn this into an "obviously govt can't do anything" point. There are plenty of very well-run governments who would have ..
FWIW it wasn't a 'no government can do anything' claim.
I have no doubt that there are a number of government agencies that can do things.
The fact that this particular project delivered a measurable 20% of projected outcomes is the point.
If you have some alternative interpretations of this outcome, they'd be very welcome.
> And no doubt there's any number of private companies who would have screwed up just as badly.
Are you suggesting I can't claim something is bad -- because something else would be just as bad?
> Trying to tar the entire idea of government with Pakistan's performance is pretty bad faith IMO.
This is a bold leap, and no faith is involved.
> this sounds like a traditional government project problem -- susceptibility to corruption, vanity, hubris etc.
said the person on a web forum (the web comes from CERN, a gov project) over the internet (the internet comes from DARPA, a gov project) on a computer (ever heard of the ENIAC? a gov project)
Tech bros mouthing off off-topicly about the government is the most tedious and boring thing ever.
https://techpinions.com/its-not-just-the-internet-how-govern...
Referring to GP's wikipedia reference, can you explain the two 'for unknown reasons' on a) why the original (Canadian) contract was not engaged, and b) the Turkish project was not engaged.
What precisely was ashistorical about any of my post?
> > this sounds like a traditional government project problem -- susceptibility to corruption, vanity, hubris etc.
> said the person on a web forum (the web comes from CERN, a gov project) over the internet (the internet comes from DARPA, a gov project) on a computer (ever heard of the ENIAC? a gov project)
I really am bewildered.
Are you claiming that because I'm using the Internet I am not authorised to claim that any government project in any country at any time is beyond questioning?
> Tech bros mouthing off off-topicly about the government is the most tedious and boring thing ever.
Goodness.
I'm sorry you're bored, I'm not a tech bro, claims of poorly run projects within the land of the pure isn't off-topic to the claims made.
Reading about some of the missteps of CSP, much like the above, they seem to be share similar traits of government mishandling, bureaucracy, dodgy dealings, etc.
EDIT: In any case, a naive interpretation of the Pakistan project cited -- if it truly is getting ~20% of anticipated power, cost per unit is 5x forecast, at which point a CSP would have been better value for money.
I suspect that solar thermal is in more than a lull; I suspect that it's been obsoleted by PV and we aren't going to be seeing many new installations at all.
I also suspect that mirrors are less sensitive to dust than PV cells. And that it's cheaper to just install more mirrors (flat reflective surfaces) to compensate for anticipated dust build-up, than photovoltaic panels (per unit of area or per unit of power generated).
But, really, I expect there's a fair bit of research on this subject already out there.
As I intimated, it's probably not so much an obsolescence issue, as one of pushing the storage question aside. CSPs address generation, with some ephemeral (cloud, evening, etc) storage capabilities. As per the standard observation - it's going to be a blend of power generation and storage technologies that sees us through.
The storage issue is interesting, but doesn't matter so much to most plants since they tie into a larger balanced grid, and battery storage is coming down in cost at the same exponential rate as PV. These same advantages are not accruing to solar thermal. So I do think we are seeing the death knell for solar thermal, even when energy storage is desired alongside peak production.
Storage can't be ignored - and the 'balanced grid' that we're all part of relies heavily on burning fossil fuels for both baseload coping with peaks (sun goes behind a cloud or the horizon, or the wind stops for a while). As we decom more of the fossil fuel systems, a more robust & scalable storage system, even a relatively ephemeral one, will become more compelling. (my prediction : )
>improves magnificently with high temperatures
Thermal solar is a solar heat energy source + classic steam turbine. The efficiency of a thermal->electric converter (turbine) is largely governed by the difference between the hot and cold side.
Increasing both the hot and cold side temperatures equally would not increase efficiency, AFAIK it would actually decrease efficiency, and without lots of water, they can't use evaporative cooling either.
Hence the C in CSP.
Contemporary molten salt CSPs operate at ~700C, so the difference between the concentrator and ambient air temperature would be 3% (at 25C) and 6% (at 45C).
In other words, a 3% difference. Perhaps measurable at the output, but certainly not significant.
New CSP designs are coming along that are working around 1000C, which would render that delta even more negligible.
In contrast, while PV cells vary, I believe max power temperature coefficients of around 0.4% / 1C is a standard figure.
That means at 25C your panels are losing 10% of max capacity, but at 45C that number goes up to 25%.
A massive reduction in capability.
As an aside, your calculations are improper, even though results are close enough. 0℃ is merely 273.15K and the temperature at which water tends to freeze. E.g. PV efficiency is usually quoted at 25℃ (or 300K), so at -20℃ they could generate cca 120% of "max" (rated) capacity.
https://en.wikipedia.org/wiki/Bhadla_Solar_Park
Apparently Bhadla is the world's largest solar park. I wonder if the two countries can co-operate on this (I know relations are mostly hostile currently)
> In December 2016, Solairedirect signed an agreement with Ecoppia, a PV panel cleaning solutions developer, to provide automated cleaning solutions to the project. Due to the park's location in a desert region, it is prone to dust storms
https://www.pv-tech.org/news/ecoppia-to-provide-cleaning-sol...
Hopefully the project eventually does reach the 2000MW scale it plans. It's not clear from the Wiki how far along it is or whether it's currently operational. It mentions opening targets for Dec 2018.
Softbank is involved for 500MW which is one red flag :p
Pakistan's big deployment is one example, it was planned to be 100MW but only produced 18MW. Mostly because they didn't factor in the dust that would cover the panels, keeping them clean was very expensive (I'm curious how this applies to other proposed desert deployments). Nor factoring in the typical malaise of public projects adding significant delays/costs, which is hardly unique to Pakistan when it comes to major infrastructure in 2020.
https://en.wikipedia.org/wiki/Quaid-e-Azam_Solar_Park
Then there's the famous Solyandra which got half a billion in US tax payer money and flopped without ever being competitive price-wise: https://en.wikipedia.org/wiki/Solyndra
Tesla's famous Australian battery factory only has enough to power 30k homes for about 1-2hrs each day. It was on-schedule, which is rare, and also makes money but scaling it up to millions of homes to make a real dent in coal would be much more challenging, especially sourcing enough lithium.
I think it's safe to take any cheery prediction from green projects and add 1.5x time/production costs and/or minus 30% of the expected output.
Note: I'm not trying to rain on the parade, I'm otherwise all for this stuff as long as it's realistic on a large scale.