The solution for this nonsense is competition. Real, honest, open, transparent competition. Combined with laws that dictate refusal to pay in excess of the bid, instant scrapping of programs that exceed cost estimates, and a 10-year timeout window between when people in DoD leadership can transition out and get jobs with DoD contractors.
As a government contractor, I agree and fully endorse this.
> The solution for this nonsense is competition. Real, honest, open, transparent competition. Combined with laws that dictate refusal to pay in excess of the bid, instant scrapping of programs that exceed cost estimates, and a 10-year timeout window between when people in DoD leadership can transition out and get jobs with DoD contractors.
...And I disagree with this fully. The solution is for the government to return to in-housing, relax the rules they hold themselves to, and aggressively expand their own capabilities. The things the government makes are far and away superior to anything in the private sector. At its best, the government does it better, cheaper, and longer-lasting than anyone else.
Real competition for the things the government needs done is just not possible. Roughly 50% of contracts are based on just flat-out lies, and it's even worse for shitty contracts like SBIRs. I'll tell you, I have seen some real dumb shit. The BUYER needs technical expertise in order to not get ripped off, and if you already have expertise it makes much more sense to go the extra miles and build it yourself.
The market for government contracts would need to be way more lucrative to allow companies to fail honestly, and even then, why would they when lying is more profitable? Plus, this doesn't even cover the worst part of large contracts, which is that they're effectively negotiated by politics, either congress itself or inter-DoD factionalism. That, more than anything else, creates large-scale rot.
After I graduated I thought I wanted to work for NASA. Then I found out most NASA employees spend most of their day not inventing or building things, but managing contractors who did the actual work.
I guess I'm saying I like your suggestion better than mine.
Can you cite examples and explain factors that you think lead to the government working at its best?
As much as I like free market competition, I think you’re probably right, at least when it comes to projects/pieces of projects where the only customer is the government. But when there’s a problem not well suited for competition to solve efficiently, that doesn’t guarantee a good government result: there’s a ton of variability in the quality of government responses.
My basic theory is this: the success of large government engineering projects depends primarily on whether or not everyone involved in the project believe it to be of existential importance (military projects during the cold war), whether its something that they will personally use and want to feel pride in (golden gate bridge), or whether or not the problem has some novel/interesting element that attracts the best and brightest.
> But when there’s a problem not well suited for competition to solve efficiently, that doesn’t guarantee a good government result: there’s a ton of variability in the quality of government responses.
Can you find me an example? By and large, the idea that the government is inefficient is a myth. There are boondoggles like Star Wars, but those are failures independent of government implementation. There are "failures" like Amtrak that are unprofitable, but they are kept running to offer services at a given price point because we want that regardless of what the market says.
Government projects are generally subject to the exact same motivations as private projects. They make profits. Employees can be fired and promoted. Innovation is rewarded, at the individual level. Underperforming projects are cut, often much more aggressively than in the free market.
Much more important than a sense of patriotism is the fact that governments are subject to intense internal and external scrutiny. Literally the most powerful people in the country are constantly looking, specifically to cut individual programs. There is no safe position in the government and institutional rot is constantly being gutted even when it's unwise, eg CDC, EPA, IRS lately. You will not find that pressure at IBM.
a) Processes can be a matter of law, requiring an extraordinarily heavy bureaucratic lift to adapt to new information or fix bugs.
b) Processes are calibrated to minimize trust. Contracting must be as obtuse as it is, because the alternative is to let civil servants make judgement calls, which the public cannot abide. This probably mitigates some serious downside risk, but it also precludes a lot of potential upside. Other institutions succeed when competent and trustworthy people just do what they think is right. (I daresay this is the only way an organization ever accomplishes anything difficult). Government agencies are only allowed to do that in emergencies, or in tiny edge cases like special forces.
c) Where leaders do have latitude, the fear of embarrassment weighs unusually heavy on their decision-making. It's harder to take good risks. I'm sure there was waste at IBM that would not survive in government. I'm equally sure there was innovation at IBM that could not have happened in government.
In some ways "government can't do anything right" is a self-fulling prophecy. The controls we implement in response to that perception make it come true. More fundamentally, I think any engineer can identify with how having to balance so many stakeholders could be incompatible with doing their best work. Making government less accountable probably isn't the answer either.
USPS is fast because its mail is hauled by Fedex. Fedex is also significantly cheaper than USPS at delivering packages if you have a large contract with them. USPS is sometimes cheaper for retail customers, though, and it's also cheaper for standard mail.
I think the problems with government controlled projects are better generalized as problems with incentives and accountability in large organizations. It’s possible to get it right, but the bigger an organization gets, and the less existential pressure it feels/the more it can let problems fester without consequence, the more problems will occur.
The most stereotypical example is the soviet union. There was no accountability, and production and quality problems were endemic to pretty much every sector under government control. Cars, food, housing, clothing, energy, etc, were all behind the west, and became increasingly behind the longer things went on.
The soviet union was a particularly horrible government, but the US government also has plenty of inefficiencies. The SLS project has been dragging for eons, while SpaceX has been accelerating rapidly. Virtually no one pays taxes directly through government interfaces; they all use private services like TurboTax because they’re much simpler to use and more user friendly that what the government provides. Publicly funded job training programs have abysmal success rates, whereas private apprenticeships a schools that earn by pairing well trained students with their first job do much better.
Once you become a mega corporation, I think accountability and incentive problems start to kick in, just like in many governments. If they also lack the internal scrutiny that you describe within the US government, they will do worse (assuming they don’t have as many differing political objectives as a government).
Because there are also examples of huge government funded successes, like the Apollo program, the Golden Gate Bridge, the internet, etc, there is some sort of difference between the government projects that work and the government projects that don’t. I think its important to explicitly determine what that difference is, rather than reduce it to a binary opinion on government projects.
So you're gonna build 75% of an aircraft carrier, and... then what?
What if the Navy builds the ships itself?
It's easy to imagine that the toilet failures here under discussion represent an isolated concern and a teething problem for the kind of new, nonessential system that you expect to see in a new class of capital warship which, after all, still gets the fundamentals right. The trouble is that, once you start really looking, that's just not borne out by the evidence.
A lot of the ideas in play with these ships, as with the LCS or the F-35, are fundamentally good. But the US military procurement process has become so deeply corrupt that we as a country are no longer capable of implementing these good ideas well. The multiple-decade, trillion-dollar boondoggle has become table stakes, and that doesn't deserve to be excused by anyone.
(Also, a Ford-class carrier has a crew of something like four thousand. They're gonna need a lot of buckets...)
(1) https://breakingdefense.com/2018/06/navys-troubled-ford-carr...
Note that this system is a privately-contracted one and was supposed to work as delivered.
This is, bare minimum, an embarrassing failure of design. No system, especially on a military ship, should have no redundancy. A single point of failure should not bring down every toilet on the ship. It's a damn aircraft carrier- splurge on separate sewage in the aft and fore.