Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room
by Pinckney on Saturday October 12, 2019 @07:19PM
(#21237030)
The numbers you've quoted, from page 7, are per MW mile, not per mile.
[ Parent
| on HN ]
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room
by dredmorbius on Saturday October 12, 2019 @07:32PM
(#21237096)
Thanks, that was a really quick check. And yeah, that would increase the costs markedly.
(My initial thought on posting was that $30 billion would not be enough, though the first read of actual per-mile costs, neglecting per MW-mile, seemed to suggest otherwise.)
Re:‘This Did Not Go Well’: Inside PG&E’s Blackout Control Room
by Pinckney on Sunday October 13, 2019 @01:14AM
(#21238509)
This PDF from Wisconsin puts the cost at $280k-390k/mi depending on the voltage of the line. They put the cost of underground transmission lines at $1.5M-2M/mi for the same voltages.
https://psc.wi.gov/Documents/Brochures/Under%20Ground%20Tran...