If you want to change the environment right now, build buildings that let people live closer to work and commute less.
When unexpected things happen it doesn't always mean anything was done wrong, or even that anything should be done differently in the future.
Permits take longer than the building?!
Demolition on the Waldorf-Astoria began on October 1st 1929. Unforeseen financial difficulties slowed progress. Construction began January 22nd 1930. The steel structure of the Empire State Building was completed on September 19th 1930. Construction was completed April 11th 1931.
These days it's more difficult- impossible- to get permitting for low rise medium density housing buildings in a city with significantly more financial resources and significantly more demand for floorspace.
Lots of structural retrofit there.
Yet I also guess that lessons from big quakes have been a part of the IBC review process. For decades.
??
Kinda of like how joints in steel frame buildings held together with stupid janky rivets would shift and creek during earthquakes while strong modern welded ones wouldn't . Progress! No wait that last bit is bad. The steel at the welded joint buckles unless carefully designed. Which they weren't for the first 30-40 years.
The 2018 International Building Code provides codes for tall CLT structures, which won't get adopted in the CA code until late 2020, which won't get adopted in the SF code until late 2022 or 2023. At that point, developers can start applying for permits for CLT buildings, which takes about four to five years. Then add two years of construction.
So SF won't see CLT structures over six floors until about 2030. Makes you realize how unseriously we're taking climate change when the only carbon-negative structural building material in existence won't exist here for another decade.