But nothing is perfect, and whilst an edge case, space weather can and does wondrous things to pylons. It's planning for such outages and the layers of vulnerability in systems that such an event can expose in which you want top people on the case and planning around such exposures. After all, you don't want your fallback site all secure but nobody put the electric security doors on their own redundant power. Might end up with such doors opening automaticly and allowing anybody in, or not oipening and preventing access to the big red switch to failover onto some backup system. Things like that you just can't overlook.
But with power-grid distribution systems, their will always be a few weak points, case of if these three transformers suddenly went offline the cascade effect would be horrific. It's those cases you need to plan for. After all, 3 lorry accidents crashing into those transformers, whilst not very likely to happen at the same time - people win the lottery every week with much higher odds.
When I was discussing the two interruptions (one on the 9nth and a smaller one on the 24th) with friends, I suggested that this could have been an attempt to map out UK's infrastructure/SCADAs, and they thought that my sandwich had too much consiracy sauce in it.
Remembering how Stuxnet interefered with Iran's nuclear centrifuges, this could very well be something similar. Just scratch it a bit, where it matters most, and let it sink on its own. No point blasting a huge hole in it.