> I wonder how fast it could have been done if they shut down 101 entirely on that stretch.

I worked with a contractor for Cal-trans 25 years ago. I'll give you an answer.

One month.

That's how long they said an overpass takes if you pre-stage everything and then shut the freeway down and work 24/7 till done.

They also say everyone just deals and local businesses don't go under when business slips for a month. But there is a lot of economic damage when construction goes on for years.

Edit: Old SF native mentioned to me that West Oakland went under during the BART construction because people couldn't get to their jobs for years. And the Castro switched from a working class neighborhood to a gay neighborhood because workers had trouble getting across Market. Workers left, gays moved up from Polk St.

Re:Full Shutdown of L Train to Be Halted by Cuomo by cure on Thursday January 03, 2019 @01:52PM (#18817949)
They've been replacing highway bridges in MA in much less time. They prefab and build up the new bridge next to the highway, then shut the highway down for a weekend, tear down the old bridge, roll the new bridge in place, anchor, and the highway was ready for use the next Monday morning. Rinse and repeat for the other direction.

They did 14 bridges in 10 weekends, cf. https://www.fhwa.dot.gov/publications/publicroads/12mayjune/...

Re:Full Shutdown of L Train to Be Halted by Cuomo by hinkley on Thursday January 03, 2019 @02:10PM (#18818157)
Wasn't there an overpass over I-5 in Seattle that got replaced, maybe ten, fifteen years back, due to fire damage from a truck fire? (please don't stop under an overpass if your vehicle is on fire!)

I think that took a month or two to replace but the actual bridge work I thought only took about a week and a half. Can't seem to find it on Google. Anyone remember when that was?

Re:Full Shutdown of L Train to Be Halted by Cuomo by fiter on Thursday January 03, 2019 @02:32PM (#18818394)
Re:Full Shutdown of L Train to Be Halted by Cuomo by flomo on Thursday January 03, 2019 @02:31PM (#18818384)
Re:Full Shutdown of L Train to Be Halted by Cuomo by hinkley on Thursday January 03, 2019 @03:53PM (#18819173)
Oh my. That’s a bit more drastic. In the case I’m thinking of the span never failed but the engineers didn’t trust the steel anymore. They closed the overpass and replaced one span.
Re:Full Shutdown of L Train to Be Halted by Cuomo by dsfyu404ed on Thursday January 03, 2019 @02:47PM (#18818541)
>They did 14 bridges in 10 weekends

Meanwhile the invoice from the state police billed for 14 whole weeks of traffic detail. I'm sure that's just a typo on their part... (For anyone unaware, state police billing for hours that were never worked is a recurring scandal that happens every couple years in MA.)

Public works projects are generally treated as a "feeding trough" so to speak in MA. It's good to see them getting done faster though. Fingers crossed that they eventually decide that fixing the commuter rail is cheaper than paying Keolis to be the scapegoat.

Re:Full Shutdown of L Train to Be Halted by Cuomo by pinot on Thursday January 03, 2019 @03:13PM (#18818829)
There's no where to stage anything at this particular bridge in Palo Alto

https://www.google.com/maps/@37.4525982,-122.1278058,3a,60y,...

Re:Full Shutdown of L Train to Be Halted by Cuomo by cure on Friday January 04, 2019 @05:42PM (#18828430)
The satellite view is helpful: https://www.google.com/maps/@37.4527175,-122.1282551,157m/da...

Southbound there isn't much room. Northbound, seems like there is space directly adjacent to the bridge.

Re:Full Shutdown of L Train to Be Halted by Cuomo by pinot on Wednesday January 09, 2019 @02:04AM (#18862880)
https://www.google.com/maps/@37.4529936,-122.1276526,3a,60y,...

That area you see in Sat is part of the bridge they were rebuilding; the frontage road.

Re:Full Shutdown of L Train to Be Halted by Cuomo by smush on Thursday January 03, 2019 @02:30PM (#18818357)
This doesn't track perfectly as its a road not a train, but similar enough to be worth mentioning.

A fire took out a section of I-85 in Atlanta in March 2017. By May 2017, it was carrying cars again...one month ahead of schedule.

https://www.wabe.org/how-have-i-85-repairs-happened-so-quick...

Re:Full Shutdown of L Train to Be Halted by Cuomo by selectodude on Thursday January 03, 2019 @02:33PM (#18818410)
They did Mullholland over the 405 in Los Angeles in a weekend.
Re:Full Shutdown of L Train to Be Halted by Cuomo by masonic on Friday January 04, 2019 @05:15AM (#18822984)
After the 1989 earthquake, despite significant work being needed in multiple damage areas, Highway 17 was reopened in something like 8 weeks.