Re:Are we stuck with cement?
by realandreskytt on Sunday July 01, 2018 @12:44PM
(#17436300)
Afaik the way cement works is you separate carbon from stone during its production and it binds co2 from air during setting. So wheres the big impact?
[ Parent
| on HN ]
It doesn't bind CO2 from air during setting- that's the disconnect.
By converting the carbonate to oxide, the calcium in cement is free to bond with silicates (and to a lesser extent other compounds).
That CO2 released during manufacture is now looking for a new home, which could either be a plant, or a weathering deposit of limestone which could use the CO2 in the air to convert its own carbonate to stable bicarbonate.
At some point it must be cheaper to just cut a massive piece of rock and ship it to the construction site, isn't it?
Re:Are we stuck with cement?
by HeyLaughingBoy on Monday July 02, 2018 @02:38PM
(#17444297)
Depends. Are you taking into account reconfiguring bridges and overpasses to make the loads fit, or factoring traffic management costs into the equation? The truckloads of concrete to make a structure individually take up a lot less space and weigh less than the final structure itself.
I've wondered about that of late. Assuming that fitting stone work was is a skilled craft. But with modern CNC technologies might be worth a look again.
Re:Are we stuck with cement?
by NegativeLatency on Sunday July 01, 2018 @12:50PM
(#17436323)
The “separate carbon from stone” step is not 100% efficient