Other comments are blaming the Liberals, but the reality is if you are an effective leader trying to create a huge infrastructure project that you care deeply about, you need to come up with a solution that will last through a change in government, with aligned economic and political contingencies. If you are just governing for fun then you do what Rudd did. It always lets you blame the next government though, as he is doing now.
It's no secret that our political systems have problems, with this sort of thing. Factionalism, corporate interests and other monority special interest, continuity.
Sometimes policies have a chance of being coherent, usually through a small group of "authors" that have a clear idea of what they want to do. This is generally when a governing party gives free reign to some internal group.
The other option is bipartisan commitees & a "wide consulatation approach". This is how the vast majority of australian laws get made. There's an alarm-like flashing oof lights (red or green) in parliament when an attempt is made to do things otherwise (a split).
Anyways, the standard process means compromise. Specifically, comromise between all "relevant" participants. The two big parties, obviously. Several interested factions within those parties, and various corporate interests usually represented by specific industry chambers of commerce or similar. Everyone needs to get something.
Coherence and compromise just don't go together, not when it comes to policy/legislation.
Look at the americans. They've been fiddling with health policy for a decade. As far as I can tell, the more attention the issue gets, the worse it gets.
Anyway, apart from being "pro-internet" labour never really had a solid agenda. The parliamentary end of this sausage factory was basically "the internet is important!!" vs "why spend 100bn on streaming cat vids!?). The hyenas and crows did the rest.
Perfectly rightfully.
> if you are an effective leader trying to create a huge infrastructure project that you care deeply about, you need to come up with a solution that will last through a change in government, with aligned economic and political contingencies.
On the other hand, the opposition can either try to work with or lie your ass off and sabotage everything, the latter being exactly what the liberals did with the NBN.
Since the mid-90s the government has imposed many regulations for control that has impeded much of the free market progress for network infrastructure. Those regulations coupled with needed external transit installations have not helped. For a long period of time the government would pick and choose companies based on their ideals rather than their talent. This has hindered progress from both sides of the fence by liberal and conservative administrations.
I ran a semi successful ISP and consulting company for a decade in the US and I have always enjoyed the tiering system we setup vs other country Infrastructures. It wasn't until recently when the FCC gained control that states started to use the new regulation power to hinder progress. I am still on the fence about the whole thing because the exploitation has not been bad in my area but the horror stores I have heard in other states make me sad. Hopefully it will get back to normal.
I remember reading years ago about interesting research being done to use photonic-bandgap rims to make fibers that would allow propagation approaching vacuum speed [2], and if deployed eventually that could drop latency by another 40-60ms. But at least back then there seemed to be enough loss (3.5 dB/km) that it'd be impractical over long distances without excessive boosters, even ignoring any cost/durability issues of the fiber itself. That may have been improved in the last 4 years though, but I'm not sure if it ever did make it to market (or if there are even plans still in progress for it, raw throughput was impressive too FWIW).
At any rate: the NZ ISPs seem to be offering pretty solid service on that front even internationally, at least in terms of pure latency. If there is increasing congestion or other issues those are just matters of capex, and between the ISP's servers and premise links there might be more lag being added in. But I don't see any glaring core inefficiencies there in terms of the international link part, unless I'm missing something entirely. Looks a lot better then I'd have expected taking a guess based on how it was a decade ago.
----
1: https://truenet.nz/international-latency
2: "Towards high-capacity fibre-optic communications at the speed of light in vacuum": https://www.nature.com/articles/nphoton.2013.45 (DOI: 10.1038/nphoton.2013.45)
However, I feel like `pacman -Syu` should be faster. I don't mind the latency, but the throughput should be better right? I only get 1-2 Mbyte/s average using US servers.
It's interesting to note that the compromises made with UFB would not fly in the U.S. Liberals would kill it as a handout to rich people ("if you can't afford to feed your family by the end of the month, you can't afford $75 a month for the broadband service")[1] and conservatives would kill it because it's not available more than 50 km from an urban area.
[1] http://www.crainsnewyork.com/article/20140219/TECHNOLOGY/140...
Vodafone currently offer 200Mbps unlimited data fibre (don't know what the upload speed is) for $110/month, and unlimited speed (up to 900Mbps, depending on location) for $120/month, and deduct $10/month if you go on a contract.
It's only in the last couple years that you can get unlimited data at a reasonable price here.
A large fraction of the cost of bandwidth in NZ is international transit, because there's only one significant undersea cable connecting NZ, the Southern Cross Cable. I couldn't find current prices, but in 2013 it cost about US$0.10/GB to go through that cable [1]
They couldn't, though, without a lot more difficulty.
You're missing the context that at the time of Rudd's election and the NBN design/build plan, Telstra was actively hostile towards the government. Solomon Trujillo was the CEO at the time, and actively fought against any suggestion that Telstra might be structurally separated (a-la Telecom NZ's split into Chorus and Spark), or be required to build a nationwide wholesale fibre network.
Telstra under Trujillo was the company that famously gave a last minute 13-page (non-compliant) response[1] to a call for bids to build the NBN, that was effectively a giant middle finger to the government.
Forcing a structural separation when the government own a minority stake in the company[2] would've required either re-purchasing it at market rates, or some kind of legislative change, and thus opening the government up to a shareholder lawsuit. At the time, the CAN and Fibre back-haul networks were considered some of Telstra's greatest assets, those would've been some major purchases.
There were a bunch of bad options, but having been backed into this corner by previous government decisions - there wasn't a whole lot they could've done.
[1] https://www.computerworld.com.au/article/270911/telstra_bann...
I do agree with the rest of your comment though.
Only after A LOT of pain. Broadband uptake was pathetic in NZ until Telecom, formed out of the NZ Post Office and sold to overseas buyers in 1990, was split up into retail (Spark) and infrastructure (Chorus) ten years ago. It's smooth sailing now, but it could have been so much easier.
One of those is really early for any internet, and the other 17 years later, is really late!
For years Telecom managed to get away with doing nothing other than charging exorbitant fees. It's just a coincidence the decision to unbundle came immediately after these comments in 2006:
> What has every telco in the world done in the past? It's used confusion as its chief marketing tool ... customers know that's what the game has been. They know we're not being straight up.
– Teresa Gattung, Telecom CEO
That is when Chorus was finally 100% separated from telecom.
From 2006-2011, Chorus were inducing congestion in the ADSL backhaul to put non-telecom ISPs (particularly ISPs with all the high-bandwidth power-users) at a disadvantage. An ISP could buy unlimited bandwidth to the outside world, and give each customer ADSL 2+ connections of upto 24Mbit, but the backhaul between Chorus and the ISP to terminate all those ADSL connections was rate-limited to roughly 64kbps times the number of connections that ISP had.
If all an ISPs customers went online at the same time and started downloading, everyone's throughput would drop to 64kbps.
And Chorus would absolutely refuse to sell any extra backhaul bandwidth.
It was in the best interest for all ISPs to have a healthy base of non-skilled users who barely used their ADSL connections, just so the rest of their users wouldn't get too congested. It was also around this time ISPs implemented various perks to encourage power-users to only download at night time.
This all stopped in 2011, and the bandwidth caps that all ISPs were offering suddenly shot up.
For example, a flaw I had with the NZ rollout: it was deployed to citizens before businesses. It feels kind of sad as a business owner when your business remains on VDSL while the suburbs are getting fibre (although lovely to get Netflix at home on fibre!).
The problem was created by the Libs in 1997, when they privatised a government monopoly, Telstra. Telstra promptly morphed into natural shape of private monopolies everywhere: a bloody great rent seeker, beholden to no one. They sat on the existing copper network assets, milking them for all their were worth and showing not the slightest interest investing to upgrade the asset when new technologies arrived. (The contrast with their actions in the mobile sector, where they didn't have a monopoly could not be more stark. We have a world class mobile network, and were the first to phase out 2G.)
10 years later, the prime minster who created this mess was still in power. It was only 10 years later, but by then it was obvious even to him something had to be done because we had this headline: “Australian Prime Minister John Howard on Monday announced a 2.0 billion dollar (1.68 billion US) plan to provide fast and affordable Internet access across the vast country”. http://www.smh.com.au/news/Technology/n/2007/06/18/118201899... Notice this was several years before Rudd "had" the same idea.
Turned out 1.68 billion was a bit of an underestimate, so it went nowhere. We've are now spending 20 times that amount to extract ourselves from the mess he created. I do hope the $14B they earned from the sale of Telstra (which is several times less than the cost of the fix) was worth it at the time.
I don't know what the acronym USO means. But I do know that the expensive locations are politically important because there is pressure for the government to build various things out in just those locations. They political lobbying arises precisely because those locations are so expensive that the locals wouldn't pay for it themselves.
https://www.acma.gov.au/Industry/Telco/Carriers-and-service-...
Second common mistake: The argument which led to the MTM replacing FTTP was not about technology. It was about the cost of capital works, and the economic model of recovery. Labor was stupid enough to float a mixed-economy pluralist argument hinting at a future independent non-utility model with zero cost (long term) to the government. This hung them because it allowed the Liberals to go hard on cost recovery and privatization. If the intent had been to reserve a national utility function in layers 1 and 2, and promote competition above this, we'd be in a different conversation.
That conversation was about structural separation of the former monopoly Telco. It was quashed by Labor, in a stupid reactive move. It was floated, and the banking sector indicated a preference. Reactively the union movement and Labor party moved to reject it: if the banks wanted it, it must be bad.
Talk about a huge missed opportunity.
The NZ model, by comparison is gold: structural separation. Crown holdings for the fiber. A pot of money, re-circulating to deploy to the cities, each region re-fills the pot to move to the next town. Far simpler. And.. fibre to (most) homes.