Re:$50B transit proposal would boost light rail throughout S...
by WalterBright on Friday March 25, 2016 @02:39PM
(#11361852)
The tracks still run through Renton and Bellevue and can connect to the rest of the light rail system in the Tukwila area.
I'd build the system to the border of Kirkland, and wait for the Kirkland residents to get fed up with rotting on 405.
http://seattletransitblog.com/2016/03/12/kirkland-st-struggl...