News for hackers. Stuff that matters.
Re:Suspended jaccuzzi by gambiting on Tuesday January 20, 2015 @06:58AM (#8916508)
Yeah, in this picture you can see the cables running through the drainage port: http://jaccuzzi.ch/photos/700/1754_264_seb_7_.jpg

So I "think" most of the load would be applied vertically, but that would be my biggest concern still.

Re:Suspended jaccuzzi by onion2k on Tuesday January 20, 2015 @07:35AM (#8916607)
This image best shows how they did it - http://jaccuzzi.ch/photos/700/1758_264_seb_11_.jpg - they looped the ropes over the top of the sides on both sides, suspending the platform directly under the bridge so there shouldn't have been any sideways force.

Still seems a bit stupid to put that much additional load on a 70 year old pedestrian bridge though.

Re:Suspended jaccuzzi by mkuhn on Tuesday January 20, 2015 @08:32AM (#8916817)
This bridge was most likely not constructed as a pedestrian bridge. What you see in the back probably is the bridge that replaced this one when a one way bridge did not provide enough capacity anymore and the old bridge was re-purposed as a passenger and probably cyclist bridge.

Based on that it was definitely built for higher load than just a few pedestrians.

Edit: The German language Wikipedia article actually confirms this [1]. It states that the bridge was built for a traffic load of 13 tons and that the new bridge was built in 1993 to increase capacity. The old bridge was thoroughly renovated after the new bridge had been constructed. The bridge actually is well documented and is under protection as an architectural landmark. It was exhibited in the MoMA for a long time.

Based on the amount of prep these guys put into this and the available documentation I don't see why they should not have checked if what they wanted to do is possible.

[1] http://de.wikipedia.org/wiki/Pont_de_Gueuroz

Edit 2: Some fascinating pictures from the time of construction: http://www.swiss-timber-bridges.ch/detail/193

Re:Suspended jaccuzzi by jacquesm on Tuesday January 20, 2015 @02:39PM (#8918965)
> NB: This bridge doesn't exist any more

That's weird. It definitely looks like it is the same bridge but that page says it has been removed.

The construction clearly shows a concrete bridge in the making (lots of concrete forms visible) whereas the heading of the page is 'Swiss timber bridges'.

Re:Suspended jaccuzzi by mkuhn on Tuesday January 20, 2015 @04:42PM (#8919839)
as far as i understand it the timber bridge was the temporary bridge used to support the construction and then torn down after the concrete bridge was completed.
Re:Suspended jaccuzzi by jacquesm on Wednesday January 21, 2015 @01:47AM (#8921869)
Ah yes, it's labelled 'falsework', so the wooden structure is indeed just to support the main structure until it can be self supporting.
Re:Suspended jaccuzzi by stolio on Tuesday January 20, 2015 @12:11PM (#8917944)
> ...platform directly under the bridge so there shouldn't have been any sideways force.

No net sideways force. Any +X force on the left wall will have a -X force on the right wall. If there's a tension T in the ropes across the top they'll be pulling the walls inward with a force of T causing a torque of T*height.

Re:Suspended jaccuzzi by jacquesm on Tuesday January 20, 2015 @02:44PM (#8919011)
> If there's a tension T in the ropes across the top they'll be pulling the walls inward with a force of T causing a torque of T*height.

Almost, you'd still have to subtract the friction component across the 90 degree angle where the cable hangs down from the edge near the porthole but that's probably relatively small compared to the total (depends on cable material and any kind of padding they put in between the cable and the concrete).

It would have been a lot better to sling those cables through the portholes on both sides and to make it loop the bridge, one person would have to rappel down to get that started but you'd have zero load on the walls.

The longer I think about this the more I think those guys and girls were extremely lucky and I hope that this will not inspire any copycats to try this with other bridges or even the same one. It's a long way down.

Re:Suspended jaccuzzi by stolio on Tuesday January 20, 2015 @03:36PM (#8919361)
I prefer to live in a frictionless world :) It looks like it was rope on metal (http://jaccuzzi.ch/photos/700/1722_264_03.jpg) with a coef. of friction of 0.2. My gut says the friction force will be at most half horizontal. That puts friction an order of magnitude lower than T, though that is more than I expected. (edit: damn, it rounds the corner from vertical to past horizontal so my symmetry argument doesn't quite hold.)

Apparently the bridge carried cars at one point (http://en.wikipedia.org/wiki/Gueuroz_Bridge) so the wall was rated for vehicle impacts, which is good.

Why they went over the top of the walls I don't know, I think they wanted to measure the ropes exactly instead of adjusting it the day of. Like, that was where they drew the line of "unacceptable risk"? I agree a loop through the drain holes would have made their lives easier in a bunch of ways, except the tripping hazard would have made it a very risky project...

Re:Suspended jaccuzzi by jacquesm on Wednesday January 21, 2015 @04:33AM (#8922269)
> I prefer to live in a frictionless world :)

Spherical cows look so much nicer too ;)

Re:Suspended jaccuzzi by nappy-doo on Tuesday January 20, 2015 @08:04AM (#8916703)
I doubt it's any more load than the bridge sees during a rainstorm.
Re:Suspended jaccuzzi by onion2k on Tuesday January 20, 2015 @08:21AM (#8916777)
The bridge is 168.36m long and (I guess) about 2m wide. If there was 1" deep water all the way along that'd be about 10 tons of loading. But that'd be distributed along the entire length of the bridge, not concentrated at a point in the middle...