Re:Bay Area tech boom not cause of region's problems
by scoofy on Sunday January 19, 2014 @05:04PM
(#7086225)
This is exactly what they did with the G train in brooklyn on the weekends. It's 2 track only, and they would shutdown one side, transfer to the other side at Bedford-Nostram. Was it a pain in the ass? Yes. Was it way better than no service... absolutely!
The Copenhagen metro is a 24/7 system, without extra tracks, that uses this method. On maintenance nights a usual pattern is a brief complete-service shutdown 1:00-1:30am to switch from regular operation to single-tracking. One track is taken out of service and powered down, and service at ~20-minute headways resumes on the remaining track. The Atlanta subway also uses this method for longer weekend maintenance sometimes, going to single-track mode all weekend (they don't do 24/7 operation, though, I would guess due to budget issues).
It's possible BART can't do maintenance with single-track operation due to how it's set up, but their message implies it's physically impossible without having spare tracks, which is not true in other systems.