Re:The Age of the Product Manager
by jjoonathan on Thursday December 12, 2013 @11:19AM
(#6895218)
Sure, but the process can become wildly unbalanced. If the engineering is enough of a limiting factor that 90% of the planned ideas never happen and the 10% remainder consists entirely of mission-critical features, then a PM doesn't have much value proposition and it makes sense to combine the engineer and PM roles (supplemented with a culture of "why are you doing that" at standups to prevent tunnel-vision).
The opposite can happen too, of course, when the engineers focus on features that nobody actually wants. I think grandparent's point was that PMs aren't always a good cure for this problem.
The opposite can happen too, of course, when the engineers focus on features that nobody actually wants. I think grandparent's point was that PMs aren't always a good cure for this problem.