It's not different than the electric grid. Power plants are pretty much binary creatures--they're either on or off. Each incremental kWh doesn't really cost any more once the plant is up and operating at design capacity, except to the extent that sufficient extra kWh might necessitate more capacity and thus more fixed costs.
You can't sell the left over bandwidth of an infrastructure you provide to a consumer.
Statistical multiplexation of the service rate (bandwidth) is the inflection for cost to the consumer. On most SP networks, if aggregate user constant load utilization increases past 10-15% committed rates, the cost model must bear service load into account.
While portions of the public want to buy 'unlimited' service, the only way that 'unlimited' service can exist at rates not deemed unrealistic is if most users of the 'unlimited' services do not create heavy usage. It's a tanstafl issue; once everyone is a heavy user, the subsidy created by uneven usage no longer exists.