Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by neltnerb on Saturday February 16, 2013 @04:22PM
(#5233090)
I'm still shocked even with your more conservative numbers suggesting that China is merely installing 7-10 nuclear power stations (4x 500MW reactors I'm assuming) worth of wind power per year. I know they're enormous, but WOW.
I am very curious what kind of cost per kWhr they are able to achieve at such large scales of deployment when doing the manufacturing locally. I know that shipping and regulatory issues are major cost drivers in the US...
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by batgaijin on Saturday February 16, 2013 @06:19PM
(#5233467)
When are they starting with the thorium ones?
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by melling on Saturday February 16, 2013 @03:46PM
(#5232953)
Regardless, it's interesting how China is accelerating past the US on the world stage. Clean energy, high speed rail, etc. So, much is accomplished in so little time. One example, that always sticks in my mind:
http://en.wikipedia.org/wiki/Shanghai_Metro
I wonder how that couple miles of the Second Avenue Subway is coming along?
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by antr on Saturday February 16, 2013 @04:25PM
(#5233100)
Right now, on the energy side, one can't really compare the US and China. The US is an already developed country, with considerable infrastructure deployed during the past 50-100 years and well established incumbent players, a region with low/single digit growth, etc. China on the other hand is a huge market, until recently with little or no energy infrastructure, fuelled by a rapidly growing domestic consumption, etc.
China has the need to accelerate and be extremely fast in all aspects of its economy, otherwise it is risking not growing at all, with devastating effects to its economy (and the world).
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by rollo_tommasi on Saturday February 16, 2013 @04:19PM
(#5233079)
It's easy to build infrastructure quickly when you don't have to bother with property rights, worker safety or environmental impact assessments.
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by muhfuhkuh on Saturday February 16, 2013 @04:48PM
(#5233156)
Eminent Domain is a very real and oft-used legal power that is given, especially by individual states in the US to seize property for whatever "public use" those governments deem worthy, including (but not limited to) road widening, infrastructure (sewer, electric, telecom fibre) improvements, and even private enterprise that trumps individual rights "for the greater good".
Please don't think that China holds exclusive dominion over such a concept.
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by prawn on Saturday February 16, 2013 @06:52PM
(#5233589)
I don't know that the two would be quite the same in practice though. It's likely that public reaction would be more of an issue in the US, etc?
Re:China On Track to Exceed Targets, Install 140 GW of Wind ...
by notdrunkatall on Saturday February 16, 2013 @11:05PM
(#5234149)
And if you have a virtually limitless supply of money.
Having been involved for years in the energy industry I can assure anyone that GTM is not a known "research" company (hence not trustworthy). The "gold standard" for wind capacity installation, projections, etc., is the Global Wind Energy Council (GWEC), hands down. GWEC states in their most recent 2012 China report that "By 2015, the installed wind power capacity [in China] will reach 100GW."
Source: http://www.gwec.net/wp-content/uploads/2012/11/China-Outlook...
China's installed capacity in 2011 was 62.4GW. In 2012 it is projected that another 15-18GW will be installed; that's 80.4GW by year end 2012 (on the high end). If 150GW is expected by 2015, a net average of 23.GW need to be installed per year. That installation rate is unrealistic due to manufacturing constraints.