Localisation is an un-solved problem - natural gas trades at 3.48 USD/MMBtu in the U.S [2]. Japan is importing LNG at 16.49 USD/MMBtu [3] - that's nearly five times the American price.
North Dakota presently lacks the pipeline capacity to export even its crude - lorries are commissioned to truck the stuff to refineries. As mentioned, you can't truck gas. So it's a choice between (a) releasing it into the atmosphere directly, (b) flaring it into the atmosphere, or, (c) delaying American crude production until a natural gas pipeline can be constructed. B is less environmentally harmful than A. C is economically a bad decision (time value of money/resources).
[1] http://www.freeportlng.com/Liquefaction_FAQs.asp#howlong
[2] http://www.bloomberg.com/energy/
[3] http://ycharts.com/indicators/japan_liquefied_natural_gas_im...
The price of LNG liquefaction plants is huge and you want them on the sea so you need pipelines too.
In September 2012 a Boston-based energy group announced that it expected to complete an 800MW natural gas power plant in Oregon within 4 years at an expected cost of $850 million [1]. Let's use this as our naïve project cost paid up-front in equity. Thus, production begins at t+4 (2017).
Let's use uvdiv's estimate [2] of $220 million of natural gas being flared each year. Let's create a paramater, capture, for the fraction of the flared gas one is able to burn in the plant. I have no idea how to estimate this; it shall be the variable we solve for. Given that from 2008 to 2011 Chesapeake Utilities Corporation (NYSE:CPK), a natural gas distributor (close enough), ran a quck-and-dirty EBITDA margin of about 40% [3] we'll assume our annual cash flows from the operation be around $220 million * capture * 40%.
The State of North Dakota believes the Bakken wells "will take 15-20 years to develop" [4]. Some guy on the internet (in the Oil & Gas Journal) thinks the fields could sustain for 30 years [5]. Thus, we are going to assume a constant quantity of natural gas gets flared each year from now until 2045. Actually, it's worse than that, since we're assuming a constant $220 million of natural gas being flared (you hedged natural gas prices for the next thirty years with IKB Deutsche Industribank).
Chesapeake Utilities pays about 6% YTM on its 2031 non-callable bond [6]; we're going to use that as our discount rate.
Assuming the universe explodes in 2045, i.e. ignoring the salvage value/cost of the plant after thirty years, our hypothetical natural gas power plant breaks even provided you can capture at least 85% of the flared gas.
Let's allow natural gas flaring, and thus our cash flow production, to decline by 3% annually (approximate decline in U.S. petrol production from 1980 to 2000) for 20 years from 2045 through 2065. Given that we built our model around the cost of an 800MW plant, I allowed both the cost of the plant and capture efficiency to vary; here are the results: http://imgur.com/h9yaa. I'd say plausibility is sustained.
∴ Back-of-the envelope it doesn't look like a strikingly profitable proposal, but with proper connections to the national electricity grid and some clever financing it could be a deal. Bakken & Three Forks is only half a decade old.
[1] http://www.toledoblade.com/Energy/2012/09/06/Natural-gas-fir...
[2] http://news.ycombinator.com/item?id=5073583
[3] http://www.google.com/finance?q=NYSE%3ACHK&fstype=ii&...
[4] http://www.nd.gov/ndic/ogrp/info/g-015-033-faq.pdf
[5] http://www.ogj.com/articles/print/vol-110/issue-4/exploratio...
[6] http://reports.finance.yahoo.com/z2?ce=571504915152148601684...
* The extra flaring is temporary, because gas pipeline which could/would be built isn't there [0]. The issue isn't capturing gas in general, but capturing it right away, this year. Your four-year power plant construction doesn't solve this.
North Dakota even has a shortage of oil pipelines [1]; they are shipping out oil by rail, at a $5-$10/barrel premium, rather than delay.
* The "interesting" part of the cost is the capture/distribution at the well. These wells are small and remote. There are 8,000 of them [2]. The amount of flared gas is just $25,000/year per well (naive average).
Already 70% of the associated gas is captured; presumably, the 30% that is flared is more difficult.
* If they extract shale gas on a large scale, they can build long-distance pipelines cheaply. There is no economic need to site power plants near the gas field -- this is a solution in search of a problem.
* If they extract shale gas on a large scale, the amounts would be much larger than the amount being flared: they will purposefully seek out gas pockets. What they're flaring now is gas they don't want to extract.
* There's incentive to delay shale gas projects: there's an enormous gas glut in the US, which is depressing prices. Things which could be otherwise profitable are temporarily not.
[0] http://www.nytimes.com/2011/09/27/business/energy-environmen...
[1] http://online.wsj.com/article/SB1000142405297020370750457701...
[2] https://www.dmr.nd.gov/oilgas/stats/historicaloilprodstats.p...
There is a supply of gas in search of demand. The infrastructure to move the gas does not exist and is costly to erect. The infrastructure to move electricity is easier to erect (do-able in the 4 years a plant would take to put up). The arbitrage is in converting the natural gas into electricity, which can more easily be exported. Again, no pipes.
Yes, there is good reason to delay shale gas projects. But this is not a shale gas project. The gas is an input. Low gas prices are a plus.
How would you get it from the 8 000 wells to the plant? Initially, probably by truck (they do this in Kazakhstan). Laughing? I recently worked on a deal that transported oil, by truck, from Oklahoma to the Gulf of Mexico, because there was insufficient rail or pipe capacity. The cracking spread was wide enough. The argument here is that the oil companies would be willing to part with the waste gas for a nominal fee, particularly if one could get an environmental agency on one's side. You'd be "buying" natural gas below market and selling electricity at market.
I think this requires more than a look at the bottom line of the gas companies. You've got to include the heath risks and quality of life from the prospective of the residents of the state.
If a gas power plant is more environmentally friendly than flared stacks (I have no idea if it is) then it would be amazing just to break even on this deal because you're profit is the health of the citizens.
Continuing this thought, the gas companies are theoretically losing $200 million a year by not doing anything. That means, if a gas plant is more environmentally friendly, they don't even have to break even on the deal. The gas companies can lose ~$200 million a year on a project like this, have the same financial outcome and still come out ahead environmentally.
Edit: My math was off. I was figuring that they were spending ~$220/year, which they are not. That means my last statement is incorrect though I still feel that losing money on a more environmentally safe solution could be worth it.
If I were proposing this deal, I would approach the State of North Dakota and surrounding localities with a request for tax incentives, etc. to increase the probability of the project going through on precisely those grounds.
So what exactly, an arbitrary 1,000% tax just to make it expensive, because of a subjective emotional reaction that says this particular 3% ineffeciency is pure evil, where 3% ineffeciencies elsewhere are natural and understandable engineering compromises?
The incentives are absolutely correct in my view. The "waste" here is apparently less expensive than the alternative (low-value gas pipelines). Maybe some peoples' guts say gas flares are an "evil" type of waste, whereas the human labor spent installing thousands of miles of unproductive pipelines is a "good" waste. I hope those peoples' guts aren't put in decision-making positions.
So yes, absolutely: impose a carbon tax, where the person burning any fossil fuel pays a price that actually reflects the externalities of their choice. That's not arbitrary at all. If it still makes financial sense to flare rather than capture, fine. But there's no pretending that everything is all right with the existing equation.
As a result, I'm not sure it's as simple as a straightforward efficiency calculation, because under a system where the consumer bears the currently externalised costs of burning fossil fuels, both the cost of flaring would go up, and the oil value captured by the drilling company would go down. I have no idea what a sane level for a carbon tax would be, and I'm certainly not economist enough to predict the ramifications for global fuels pricing; like I say, it may well work out that flaring remains cost-effective. But the costs of an action should be borne by the party that benefits, otherwise the incentives are, as I say, totally screwed.
It is easy enough to harvest from biological processes and if you really need it, it can easily be synthesized:
You should probably just be advocating a carbon tax since that addresses this externality in a more general way.
For a year (with extensions), North Dakota allows drillers to burn gas, just let it flare.
They put a cap on it.
It seems barely anybody is concerned by this. Sure if it's 2.6%, 97.4% will be released in some form at some point, but those 2.6% are lost with a utility/greenhouse ratio of effectively zero. That's 150 million cubic feet per day flared into heat+CO2 for naught. I don't know how this stacks up against other means of getting oil.
FWIW, France could economically benefit from fracking, but it has been decided at the political level to ban the practice until it can be made provably safe and sound.
But the marginal utility of capturing that gas is negative: less than zero.
(By the way it's 4.2%, not 2.6%; my post has an error and I can't edit it. There's a mismatch between the gas flaring and oil production figures: one is from 2011 (NYT article), the other 2012 (WSJ). It's a large error because oil production doubled in the space of a few months).
The amount of gas being flared in North Dakota is about 150 million cubic feet per day [0], worth (at $3.95/thousand cubic feet, at the wellhead [1]) $220 million per year.
The amount of oil being sold is 728,000 barrels per day [2], at $95/barrel, worth $25.3 billion (B) per year.
For the oil producers, this flaring is a financial rounding error (<1%). I think it's credible that $200M/year of gas, distributed over hundreds of oil wells, can be unprofitable to recover.
In various metrics: the natural gas flared / oil produced is
* 0.9% of the value ($$$)
* 3.7% of the raw energy (Joules)
* 2.6% of the raw carbon (-> CO2)