Re:SpaceX Catches the Starship to end Flight 15
by thaeli on Saturday November 14, 2026 @10:29PM
(#50503712)
Cost savings are one of the drivers for reuse, but not the only one. Maximum practical flight rate is another. F9's peak flight rate over the past couple years would not have been attainable without first stage reuse, simply because of the manufacturing bottlenecks on stages. And fairing reuse was openly driven by a limited capacity to manufacture fairings fast enough - it's not even clear that SpaceX is overall saving money there, but they are saving time, and their business model is based around putting as much mass in orbit as they can as fast as they can.
[ Parent
| on HN ]
Re:SpaceX Catches the Starship to end Flight 15
by HarHarVeryFunny on Sunday November 15, 2026 @03:10PM
(#50510212)
One interesting aspect to the need for flight rate is Starlink replacements ...
The planned constellation size is ~40,000 satellites (they currently have ~11,000), and the designed lifetime of the satellites is 5 years. Replacing 40K satellites every 5 years means 8000 per year, which would be 160 launches per year at 50 satellites per launch - i.e. a sustained 3 Starship launches per week just to replace satellites.
So, they'll need to be able to refurbish 3 starships (& boosters) per week, just to maintain the size of the Starlink constellation !!
Re:SpaceX Catches the Starship to end Flight 15
by NetMageSCW on Sunday November 15, 2026 @03:22PM
(#50510323)
No, they just have more Starships in the refurbish flow to accommodate the launch schedule. If you need to launch 3 a week, 6 will allow you to refurbish over two weeks and 24 will allow you to refurbish each for a month. There’s a reason they also designed a factory to make more Boosters and Starships.