Re:CoreWeave bond yield tops 16% as AI credit stress rises by CoolestBeans on Monday November 09, 2026 @11:40PM (#50436128)
Hyperscalers and SPVs are still planning on accelerating the buildout in 2027. Also even if everything hit the fan tomorrow, it will take time for production to shift back into consumer products if that's even what companies decide to shift to.
Re:CoreWeave bond yield tops 16% as AI credit stress rises by Hamuko on Tuesday November 10, 2026 @01:02AM (#50436649)
I don't the envisioned scenario is that a data centre company fails and Nvidia starts making RTX 5090s for consumers. Rather, one of these companies fails, their stock of enterprise GPUs gets flooded on the market, and suddenly the people/companies buying RTX 5090s for local inference can buy full fat enterprise GPUs, shifting demand.
Re:CoreWeave bond yield tops 16% as AI credit stress rises by wmf on Tuesday November 10, 2026 @01:29AM (#50436792)
If a neocloud fails, it makes more sense to recapitalize it and leave the GPUs in place. If you sell the GPUs nobody will have enough power to run them.
Re:CoreWeave bond yield tops 16% as AI credit stress rises by Hamuko on Tuesday November 10, 2026 @04:50AM (#50438084)
If you sell the GPUs, they will get dispersed all over the world.
Re:CoreWeave bond yield tops 16% as AI credit stress rises by bix6 on Tuesday November 10, 2026 @09:09AM (#50440633)
Wow wow wow hold on now, RAM and GPUs are only for the AI lords
Re:CoreWeave bond yield tops 16% as AI credit stress rises by reverius42 on Tuesday November 10, 2026 @01:32AM (#50436805)
If by enterprise you mean datacenter (which is what CoreWeave is), the "full fat" cards aren't as plug-and-play in a desktop PC as the consumer cards. They don't typically come with fans, and are meant to be cooled using some kind of holistic whole-rack (or larger) setup. Hobbyists do sometimes buy datacenter GPUs secondhand (and I have considered it, for the price/performance ratio) but it's kind of a lot of work and they tend to run hot.
Re:CoreWeave bond yield tops 16% as AI credit stress rises by overfeed on Tuesday November 10, 2026 @03:35AM (#50437594)
> [...] but it's kind of a lot of work and they tend to run hot.

Anyone that can open their computer to install an SSD, or a consumer-grade GPU, can install a data center GPU with a fan-kit; it's not rocket science.

Re:CoreWeave bond yield tops 16% as AI credit stress rises by Hamuko on Tuesday November 10, 2026 @03:37AM (#50437608)
There's probably still plenty of demand for that. At least someone in the executive team was floating around the idea of buying up some Nvidia cards to run AI models for the entire company somewhere locally. I don't think they'd be opposed to buying up data centre GPUs without fans if they suddenly flooded onto the market, even if that meant getting a rack chassis and a bunch of noisy server fans.

I've also seen someone sell their old fanless Nvidia cards on the local marketplace. There are definitely consumers running these things in their basements.

Re:CoreWeave bond yield tops 16% as AI credit stress rises by officeplant on Tuesday November 10, 2026 @09:51AM (#50441202)
> but it's kind of a lot of work and they tend to run hot.

Most of the common used datacenter cards have people just 3d printing blower fan shroud attachments. Or using 3M/Gorilla Tape.