Re:In Ukraine, distributed renewables foil Russia's assaults by abc123abc123 on Sunday October 04, 2026 @12:11PM (#49955159)
Lead times such as... 4 years? Sounds like light speed compared with a lot of other mega-engineering projects. Kashiwazaki-Kariwa 6 & 7, ~4.3 years.
Re:In Ukraine, distributed renewables foil Russia's assaults by ViewTrick1002 on Sunday October 04, 2026 @05:43PM (#49958204)
Which is why the best possible days for the first EPR2 reactor in France is 2038 with massive state support.
Re:In Ukraine, distributed renewables foil Russia's assaults by leonidasrup on Monday October 05, 2026 @10:04AM (#49965067)
The Civaux 2 reactor was connected to the grid in 1999, marking the end of the main 20th-century deployment wave. Flamanville 3 (EPR) reactor in Normandy was connected to the grid on December 21, 2024, marking the first new nuclear reactor added to France's network in 25 years.

https://www.statista.com/statistics/462168/nuclear-reactors-...

France really decimated it's nuclear industry, it takes lot of money and time to restore back capabilities (heavy forging, nuclear grade quality construction) and train people.

Let's not forget that in 2015, French president Hollande promised to slash nuclear's contribution of power generation by 2025.

https://spectrum.ieee.org/renewables-up-nuclear-down-in-fren...

It was really only 2022 Russian invasion, that showed that slowly replacing nuclear power with imported gas was a bad strategy. (This error is still not acknowledged in Germany)

Re:In Ukraine, distributed renewables foil Russia's assaults by ViewTrick1002 on Monday October 05, 2026 @10:47AM (#49965598)
I have a hard time taking you seriously when you claim that Germany replaced nuclear with fossil gas. It has been roughly flat for the past 20 years while coal generation collapsed, renewables exploded and nuclear disappeared.

And this still assumes that rebuilding a nuclear industry somehow is an end in itself. It isn't.

The objective is to decarbonize society. Not construt nuclear reactors. We don't have any special obligation to build new nuclear, anymore more than there was an obligation to keep building oil-fired power plants once they stopped making economic sense.

Re:In Ukraine, distributed renewables foil Russia's assaults by leonidasrup on Monday October 05, 2026 @03:24PM (#49969274)
> coal generation collapsed

Coal generation was taxed out by EU Emissions Trading System, physical costs of mining lignite in Germany and operating coal power plants are the same as 20 years ago. (and the health impacts are still very negative)

https://www.cleanenergywire.org/news/german-regulator-says-n...

> nuclear disappeared

Nuclear in Germany disappeared not for economic reasons, but for political reasons.

" Following a wide public debate, the Atomic Energy Act was amended accordingly on April 22, 2002. The aim was to phase out nuclear energy for the commercial generation of electricity in an orderly manner. To this end, each nuclear power plant was assigned a residual electricity volume such that the total output of the respective plant corresponded to an average 32-year lifetime. The construction of new nuclear power plants was banned altogether. "

https://www.base.bund.de/en/nuclear-safety/nuclear-phase-out...

The objective in Germany changes over time, in the 2000s it was removing nuclear power from electric grid, without much consideration for CO2 emissions. ( Construction of the last new coal power plant in Germany, Datteln 4, began in November 2007. Entered commercial operation on May 30, 2020)

https://www.powermag.com/germany-brings-last-new-coal-plant-...

Now in 2026, it's slowly removing fossil fuels from electric grid and the whole industry. I say slowly, because state subsidies are already allocated for construction of new gas power plants in Germany.

" Germany will initially hold two sets of auctions for new backup power plants with a combined capacity of 11 gigawatts (GW). Of these, the first tenders (8 September and at the end of December 2026), covering 9 GW, are aimed at so-called "long-term capacity", which is capable of supplying electricity continuously over an extended period, ensuring that even prolonged periods without sufficient renewable energy generation can be covered. It is likely that only gas-fired power plants will be successful in these auctions. Successful bidders receive remuneration for having electricity available once a facility is built, providing the financial incentive needed to invest in the first place. "

https://www.cleanenergywire.org/news/germany-passes-law-subs...