> then throw it away and let your Engineers build the real thing
Aaah, but the pull of "it's already built, 90% is done, let the eng polish it and that's it!" productivity siren song is strong...
Aaah, but the pull of "it's already built, 90% is done, let the eng polish it and that's it!" productivity siren song is strong...
SHOWING internal folks something is always more compelling than words on a slide. So if you have good alignment with your Engineering team that the thing is possible, you can go off on your own and vibe-code something to garner internal alignment... and then throw it away and let your Engineers build the real thing. And they won't have to spend extra time on a PoC that's only meant to show off internally.