Re:250MWh 'Sand Battery' to start construction in Finland
by helsinkiandrew on Friday November 28, 2025 @12:52AM
(#46075880)
And in Finland: 60% of Finnish wind energy 'collected' in the winter months (Oct-Mar)
https://suomenuusiutuvat.fi/en/wind-power/wind-power-in-cold...
Re:250MWh 'Sand Battery' to start construction in Finland
by lanthade on Friday November 28, 2025 @01:28AM
(#46076077)
I think the point is that winter can create periods where there is neither adequate wind or adequate sun. Having strong wind production at some times will only be good if there's a way to store the excess. That's exactly what this project does and I believe that was GPs point.
Re:250MWh 'Sand Battery' to start construction in Finland
by fulafel on Friday November 28, 2025 @04:15PM
(#46082819)
Generally lulls in wind production are more common in summer. But they do happen in all seasons. And the district heating application of this sand battery is of course more relevant in the winter when there's more demand for district heat.
Wind does better in the winter.
See eg here for Canada monthly stats: https://www150.statcan.gc.ca/t1/tbl1/en/tv.action?pid=251000...
Also, wind does better at night than day, which may be related or not.