It certainly is asinine.
The reason more than 180 degrees of bends is not allowed is because it becomes too hard to pull the wires through. If the inspector was there looking at finished work, the wires are already pulled.
1: e.g. I saw an inspector not allow two 90deg. bend in RMC because, while the existing RMC went through a wall, and came out in a straight line on the other side, without knocking out the wall, we couldn't prove that there weren't already 3 90deg. bends. Maybe that's the right call (the electrician certainly thought it was asinine), maybe not, but things like that can significantly increase the time for project completion, since there are downstream effects to the scheduling.