Re:Puerto Rico's Solar Microgrids Beat Blackout by Symbiote on Thursday June 26, 2025 @02:46PM (#44390149)
Lineworkers will ground/earth the line with a very good connection (e.g. metal rod into the ground) before working on it, as far as I know.

(At least, this is what electricians working with 33kV in industry in Europe do, e.g. if doing maintenance on a cable to a datacentre.)

Re:Puerto Rico's Solar Microgrids Beat Blackout by rtkwe on Friday June 27, 2025 @09:36AM (#44396705)
I haven't seen them doing that on power outage post storm line repairs near me, usually during those they're working as fast as possible because they have dozens of other spots they need to repair.
Re:Puerto Rico's Solar Microgrids Beat Blackout by BenjiWiebe on Friday June 27, 2025 @11:15AM (#44397433)
Hopefully they're bonding the line to their bucket at least.
Re:Puerto Rico's Solar Microgrids Beat Blackout by rtkwe on Friday June 27, 2025 @01:40PM (#44398725)
Probably I've just not seen them ever drive in a ground rod while doing basic line repair work.