Re:Full power outage in Spain and Portugal
by lr1970 on Monday April 28, 2025 @06:29PM
(#43826809)
bringing islands together requires one to synchronize both -- frequency and phase. It is super difficult for large generators and transmission lines. transient heat dissipation can be a real bummer.
[ Parent
| on HN ]
Re:Full power outage in Spain and Portugal
by bill3478 on Monday April 28, 2025 @07:36PM
(#43827276)
They can use GPS to synchronise or back-to-back DC if available.
Re:Full power outage in Spain and Portugal
by ForOldHack on Monday April 28, 2025 @07:24PM
(#43827190)
One of the very most critical parts of a solar system is the grid tie.
Re:Full power outage in Spain and Portugal
by Dylan16807 on Tuesday April 29, 2025 @12:26AM
(#43828682)
How hard is getting each island within .1Hz of correct? The full grid doesn't have much trouble, but I don't know how much cutting things down impacts that.
And then phase will align itself a couple times a minute so what's difficult about that part?