It can’t be both not quire and the same.
All else being equal, a five billion dollar geothermal plant running at 50% has the same problem as a five billion dollar nuclear plant running at 50%: where’s my profit?
Sure, load following is trivial with geothermal, but nuclear generally isn’t trying to compete in that space, so we can discount the difference there.
For nuclear, adding thermal storage for time shifting would be the most equivalent to what's happening with geothermal storage, but with geothermal there's no additional capex or engineering needed.
I don’t understand how you think capex works?
You outlay x on capital expenses to get the plant running, that’s all the plant and equipment. You run the plant at 50% it takes you twice as long to recoup your capex.
Always happy to be corrected.
Reducing the draw from the well at time X, leaves more available at time Y. In this way, the capital cost is reasonably preserved and your correction is offered.
--It's not exactly the same thing as flux ---I haven't verified the relative losses here of delaying utilizing the available heat, but rather am assuming the OP is correct about what I believe to be their point*
If the geothermal plant isn’t ran at or near capacity all the time, the capex takes longer to recoup.
You can’t just, say, run it at 50% for a while, and then at 150% later, because a) ya typically can’t run plant at 150%, and for power generators ya can only run them at whatever you’re contracted to supply, so you’d typically want to run geothermal at capacity all the time.
This is true of anything that requires capital expenditure.
> They just let pressure build up higher than normal for 6-8 hours and then the turbine generates more power than normal until the pressure falls back to normal levels again.
So they can run at more than 100%.
The expensive bit is drilling and that gives you roughly X heat per month. You can use that at a constant rate or all in one week.
Of course we can build something less efficient to allow "pressure build up", but that's another trade off.
Isn't this logic flawed?
> Sure, Metric A is better with Option A, but Option B is so bad in that space they are avoiding it, therefore we can discount the difference there.
The cost of enhanced geothermal is roughly the exact same cost as nuclear today (if you exclude the very high cost of failed build attempts for nuclear), and it shares similar economics of a very very low OpEx to CapEx ratio. However the economics differ massively in that enhanced geothermal is getting cheaper as we build more, but nuclear tends to get more expensive as we build more. Geothermal is a technology, nuclear is a monument.