I don't agree with the above comment:
> Fervo isn't just trying, they are succeeding
Or they simply ran into headwinds on a speculative project. I'll "take the under" when your PR is cagey about basic project attributes.
It will be interesting to see the results of the Cape project once they do multi-well laterals from a single pad power plant with larger diameter wells. That is really more a demonstration of power plant economics beyond the technical feasibility of creating a horizontally fracked reservoir that can be operated for a year.
Cape Station does look much more significant. [0] 400MW of power plant capacity with 2028 COD and mostly contracted with SoCal Edison? Good job.
[0] https://www.utilitydive.com/news/cape-station-enhanced-geoth...
Fervo/Google got dogged for announcing their plant in UT because they avoided disclosures about the capacity [0]. It's more of a very small scale pilot of a couple MWs, but they buried key facts about the project assumedly on purpose due to lack of significance.
[0] https://blog.google/outreach-initiatives/sustainability/goog...